Similar Projects
Adams and Academy Street Pump Station Control Upgrade
Post-Bid
Fair Haven, VT 05743

Pleasant Street Pump Station Replacement Project
New Construction
Results
$125,000 est. value
Brighton, VT 05846

Fletcher Road Water and Sewer Extension
Results
$780,000 est. value
Fairfax, VT 05454

River Road Pump Station Replacement, Contract No. 1
New Construction
Results
$235,000 est. value
Johnson, VT 05656

Barre North End Pump Station Replacement
Infrastructure
Results
$200,000 est. value
Springfield, VT

Troy Pump Station Flood Mitigation
Renovation
Results
$280,000 est. value
Troy, VT 05868

Lane Press Pump Station and Force Main - City of South Burlington
Renovation
Conception
$1,550,000 est. value
South Burlington, VT

Essex West Booster Pump Station and Transmission Main and Essex East Pump Station Upgrade
Results
$1,781,651 est. value
Essex, VT 05452

Remote Wastewater Infrastructure Improvements - Flynn and Fletcher Pump Station
Results
Burlington, VT

Reported 07/07/2022 08:36 AM
Project Title

Hinesburg Road Pump Station and Dorset Station Force Main - City of South Burlington

Physical Address View project details and contacts
City, State (County) South Burlington, VT   (Chittenden County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025
Bids Due View project details and contacts
Estimated Value $3,700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined This project is in included in the City of South Burlington FY 2023-2032 Capital Improvement Plan (CIP). As of July 06, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents