Similar Projects
Last Updated | 06/04/2021 08:21 AM |
Project Title | CDBG Utility Building And Site Improvements |
Physical Address | View project details and contacts |
City, State (County) | College Park, GA 30337 (Fulton County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Misc. Buildings, Site Development |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The City of College Park is searching for a qualified company(s) to complete the improvements proposed at Charles Phillips Park, 4400 Herschel Road, College Park, Georgia 30337. Base Proposal 1. Utility Building: a. The work shall consist of the construction of 240 s.f. Utility building to house pumps and provide chemical storage including lighting, electrical outlets, power panel to serve Splash pad, Site Lighting and Ticket Both pursuant to construction documents. b. The contractor shall provide as the pump room flooring is being poured, a 36" x 18" rectangle opening in the flooring for a "block out". This will ensure the lines will be underground go from the pump room flooring and under the sidewalks, to the pad. Coordination with Splashpad contractor will be required to locate the ideal block out. c. Required concrete testing shall be included as required. 2. Site Grading, Pavement & Drainage: a. The work shall consist of Walkaway (est. area 2000 s.f.) and Stamped concrete (est. area 500 S.F.) Construction installation of pavement flume including associated demolition, clearing, and grading, earthwork, erosion and sediment control, sod installation disturbed areas and restoration of existing structures impacted pursuant to construction documents. b. The rough grading elevation for this shall be established at this adjusted elevation (finished grade – depth of splash pad concrete). The splash pad concrete depth is six inches and compacted to meet 98% standard proctor. 3. Site Utilities: a. Water Service line: The work shall consist of the installation of 1- inch water service line connection to existing water line approximately 276 linear feet of Schedule 80 PVC pipe including 1-inch meter and backflow preventer and tapping fees ($1,700) within ten feet of splash pad connection pursuant to construction documents. Required test and disinfection of lines shall be included as required. |
||||||||||||||||||||||||||||
Details | Misc. Buildings, New Construction.
|
||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |