Project Title | Comfort Station and Parking Lot at Chittenango Falls State Park |
Physical Address | View project details and contacts |
City, State (County) | Cazenovia, NY 13035 (Madison County) |
Category(s) | Entertainment/Recreation, Heavy and Highway |
Sub-Category(s) | Restroom/Bath House, Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $8,500 to $1,338,200 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The General Work Contract D005923 or “GCW” includes all labor, materials, and equipment as indicated in this project manual including the drawings and specifications including but not limited to: Construct one new Comfort Station building; site utilities, (electricity, communications conduit, sewer, and water), and connection of building utilities 5-ft. outside the building: (Exceptions: electricity shall be brought into the panelboard or disconnect switch in the buildings, for termination by the Electrical Contractor); pavement reconfiguration and landscaping around the building and site; all site preparation and earthwork work unless otherwise indicated; all erosion sedimentation and pollution control work; installation of the sanitary force main pipes and appurtenances; furnish and install exterior water fountain, and furnish and install site water, electrical, and sanitary services; furnish and install new pump station, manholes and associated piping: (All conductors, terminations, ands startup of the sewage station are by GCW, although some conduits are by ECW); include all lawn, vegetative ground cover and landscape planting work, except for work noted as “NIC” or “Not in Contract”; provide pads and mounting for two parking lot pay kiosks; Provide electrical and telecommunication services to each kiosk, and termination at kiosks; and provide improvements to the parking lot. Unit Price: Provide Rock Removal & Replacement with Suitable Soil Material according to Section 31 20 00 Earth Moving for 1000 cubic yards. Alternate #1: Bidders shall state the amount to be added to the base bid for providing improvements to existing parking lot entrance from NY State Route 13, including but not limited to: milling existing pavement, provide sub-base material, pavement, and striping. The estimate range for the General Contract D005923 portion of this project is: $989,100 - $1,338,200. The Electrical Work Contract D005924 or “ECW” includes all labor, materials, and equipment as indicated in this project manual including the drawings and specifications including but not limited to: Installing: all wiring, switches, outlets, boxes, light fixtures, and photovoltaic system with integration with National Grid, for the Comfort Station. Provide terminations for conductors for parking lot pay kiosk. Terminate all source and load feeders at electrical panels in the building. At existing contact station ticket booth, provide breakers, conduit, and terminations for feeder to parking lot pay kiosk. includes mounting the sewage pump station control panel, and alarm panel, which are furnished by the GCW. The Electrical Contractor is also responsible for inter-wiring of these components and wiring to the sewage pump. Sewage pump is furnished by the GCW. The estimate range for the Electrical Contract D005924 portion of this project is: $66,300 - $89,700. The Mechanical Work Contract D005925 or “MCW” includes all labor, materials, and equipment as indicated in this project manual including the drawings and specifications including but not limited to: Installing ductwork, grills, ventilation fans, and energy recovery units. Include all required concrete mounting pads. The estimate range for the Mechanical Contract D005925 portion of this project is: $8,500 - $11,500. The Plumbing Work Contract D005926 or “PCW” includes all labor, materials, and equipment as indicated in this project manual including the drawings and specifications including but not limited to: Installing all domestic water piping, valves, fixtures, hot water heaters and connections, as well as all sanitary piping, and sanitary connections to 5-feet outside Comfort Station. The estimate range for the Plumbing Contract D005926 portion of this project is: $75,650 - $102,350. Each bid must be prepared and submitted in accordance with the Instructions to Bidders and must be accompanied by Bid Security in the form of a certified check, bank check, or bid bond in the amounts as follows: General Contract D005923: $25,000.00, Twenty-Five Thousand Dollars & 00/100.; Electrical Contract D005924: $4,000.00, Four Thousand Dollars & 00/100.; Mechanical Contract D005925: $1,500.00, One Thousand Dollars & 00/100.; Plumbing Contract D005926: $4,000.00, Four Thousand Dollars & 00/100. |
||||||||||||||||||||
Details | Restroom/Bath House, New Construction.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |