Last Updated | 07/25/2023 08:13 AM |
Project Title | Interchange (New)/Construct Interchange Ramps/Drainage Improvements/Bridge Repair and Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Orlando, FL 32801 (Orange County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $82,895,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Counties: Orange Road Name: SR 400 (I-4) Limits: From Valencia Water Control District Facilities Project(S): 44111315201(*) Federal Aid No: D520035B Project(S): 44111335201 Federal Aid No: D522003B Total Roadway Length: 1.780 Miles Contract Days: 950 Total Bridge Length: 0.000 Miles Total Proposal Length: 1.780 Miles Contract Execution Days: 10 Special Start Date: N/a Aquis/flexible Start Time: 120 Calendar Days For projects in excess of $50 million, in addition to meeting all other qualification requirements of Section 337.14, Florida Statutes, and Rule Chapter 14-22, Florida Administrative Code, any Contractor who is not prequalified and in good standing with the Department as of January 1, 2019, must submit evidence which demonstrates satisfactory completion of at least two projects, each in excess of $15 million, for the Florida Department of Transportation or for any other state department of transportation. Acceptability of the evidence related to the two projects is at the sole discretion of the Department. The improvements under this contract consist of construction of a new interchange at SR 400 (I-4).The new interchange includes the construction of three interchange ramps, a collector-distributor roadway, and a diverging diamond interchange on Daryl Carter Parkway. Improvements include one new ramp bridge, modifications to the existing bridge on Daryl Carter Parkway, additional lanes along SR 400 (I-4),and updates to the existing Drainage, Signage, Pavement Markings, Lighting, Signalization and ITS facilities in the project area. This Contract also contains the construction of modifications the storm drain conveyance network connecting the Valencia Water Control District facilities to Big Sand Lake through the SR 400 (I-4) and Central Florida Parkway Interchange area in Orange County, FL. An existing ditch will be closed and piped and new cross drains will be installed underneath Palm Parkway and SR 400 (I-4). For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 018 Interchange (New)/Construct Interchange Ramps/Drainage Improvements/Bridge Repair and Rehabilitation |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |