Similar Projects
Lido Key Hurricane Storm Damage Reduction Project Sarasota County, Florida
Post-Bid
$20,000,000 to $30,000,000 est. value
Sarasota, FL 34230

Lido Key Hurricane Storm Damage Reduction Project Sarasota County, Florida
Post-Bid
$20,000,000 to $30,000,000 est. value
Sarasota, FL 34230

CBJTC Precinct Road North Culvert Replacement
Results
Less than $500,000 est. value
Starke, FL 32091

CBJTC North Tank Trail Emergency Repair
Results
Less than $350,000 est. value
Starke, FL

Canal Maintenance Services
Term Contract
Post-Bid
Miami, FL 33128

CBJTC East Bay Road Washout Repair
Results
Less than $500,000 est. value
Starke, FL 32091

Washington County Concrete Drainage Features
Post-Bid
Chipley, FL 32428

CBJTC Gulfport Street Washout Repair
Results
Less than $420,000 est. value
Starke, FL 32091

Construction Services for Poitras East Community Development District
Post-Bid
FL

CBJTC Mosley Road Washout Repair
Results
Less than $500,000 est. value
Starke, FL 32091

Kaicasa - Concrete Box Culvert
Post-Bid
Immokalee, FL

CBJTC Prison Camp Road Washout Repair
Results
Less than $300,000 est. value
Starke, FL 32091

10/1366DN EGLIN NON-POINT SOURCE PROJECT OKALOOSA / W
Post-Bid
Eglin AFB, FL

Seawall Repair
Results
Everglades, FL

Sweetwater Drainage Improvements: Phase 8A
Post-Bid
Sweetwater, FL 33174

Last Updated 02/10/2020 08:45 AM
Project Title

Tibet Drive Drainage Improvements

Physical Address View project details and contacts
City, State (County) Milton, FL 32570   (Santa Rosa County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Drainage Improvements Project is for Tibet Drive located off Highway 98 in the Tiger Point Community. This project consists of replacing an existing underground pipe under Tibet Drive and in the existing drainage easement. The existing pipe is actively failing and was previously slip-lined several years ago. The proposed improvements removal of existing pipe and structures and the construction of new storm drain structures, storm drain piping, riprap, and sodding.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents