Similar Projects
Neuse River Resource Recovery Facility Bioenergy Recovery
New Construction
Bidding
$105,000,000 est. value
Raleigh, NC 27610

Wastewater Treatment Plant 2 Improvements
Renovation
Bidding
$5,500,000 est. value
Sylva, NC 28779

EMJ WTP Flocculation and Sedimentation Basins 1-4 Modifications
Post-Bid
Raleigh, NC 27614

P1043 Water Treatment Plant Replacement, MCB, Camp Lejeune, NC
Renovation
Post-Bid
$25,000,000 to $100,000,000 est. value

Wastewater Treatment Facility Upgrades
Results
Surf City, NC 28455

Water Treatment Plant Improvements
Results
Less than $13,000,000 est. value
Smithfield, NC 27577

Jacob Cornsilk Community Complex
New Construction - 46,370 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Robbinsville, NC 28771

GUC Water Treatment Plant Phase 1 WTP Improvements
Construction
Greenville, NC 27834

Wastewater Treatment Plant Septage Offload Station
Infrastructure
Post-Bid
Dunn, NC

Hominy Creek Wrf Blower Improvements Project
Results
Wilson, NC

Northwest Water Treatment Plant Expansion and Upgrades
Construction
Bolivia, NC 28422

Water Treatment Plant Improvements and Distribution System Repairs
Infrastructure
Post-Bid
Maysville, NC

Water Treatment Plant Improvements Volume I Sanitary Lift Station Volume II
Results
$1,700,000 est. value
Greensboro, NC

Neilson Water Treatment Plant Modernization Project
Renovation
Construction
Clemmons, NC 27012

Contract No. 10 - Wastewater Treatment Plant Improvements
Renovation
Post-Bid
$500,000 to $1,500,000 est. value
Seaboard, NC

Last Updated 05/19/2022 01:27 AM
Project Title

G G Hill WTP Lagoon Closure

Physical Address View project details and contacts
City, State (County) Wake Forest, NC   (Franklin County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The closure of existing alum lagoons and related structures, removal of three above ground storage tanks (ASTs) used for the storage of chemicals at the former Town of Wake Forest, G.G. Hill Water treatment plant. Place Order

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents