Similar Projects
Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Design
$10,000,000 to $25,000,000 est. value

Watrous Avenue from SouthWest 56th Street to SouthWest 61st Street
Infrastructure
Bidding
$1,700,000 est. value
Des Moines, IA 50315

Rock Creek Greenway Trail Improvements
Infrastructure
Bidding
$125,300 est. value
Ankeny, IA 50023

Commerce Crossings Development Public Improvements
Infrastructure
Post-Bid
Bondurant, IA

Truck Entrance Road Rehab and Replacement
Infrastructure
Post-Bid
Johnston, IA

2021 PCC Street Patching Program
Infrastructure
Results
$446,625 est. value
Ankeny, IA

2021 HMA Residential Paving Program Contract 2
Infrastructure
Results
$800,000 est. value
Des Moines, IA

2022 Miscellaneous Pavement Repairs
Infrastructure
Bidding
$209,000 to $231,000 est. value
Des Moines, IA 50321

Camp Dodge Truck Entrance Road Rehab and Replacement
Renovation, Infrastructure
Post-Bid
Johnston, IA 50131

Valley View Park North Loop Road Extension
Infrastructure
Results
West Des Moines, IA

NE 3rd Street Parking Lane Addition - Cornell Elementary
Infrastructure
Bidding
$400,000 est. value
Des Moines, IA 50313

I-80 - HMA Joint and Crack Sealing
Infrastructure
Post-Bid
$125,000 est. value
IA

Booneville Road - South 100th Street to South 115th Street
Infrastructure
Results
West Des Moines, IA

HMA Resurfacing with Milling - I 80
Infrastructure
Bidding
$125,000 to $250,000 est. value
Altoona, IA 50009

NE 36th Street Reconstruction
Infrastructure
Post-Bid
$4,765,160 est. value
Ankeny, IA 50021

Last Updated 05/23/2022 01:25 AM
Project Title

East 3rd Street Reconstruction from East Court Avenue to Iowa Interstate Railroad

Physical Address View project details and contacts
City, State (County) Des Moines, IA 50309   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $355,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

driveways, PCC sidewalks, modified subbase, storm sewer, intakes, pavement markings, site furnishings, plantings, miscellaneous work and incidental items; all in accordance with the contract documents, including Plan File No. 642-129/153, located on E. 3rd Street from E. Court Avenue to the Iowa Interstate Railroad at E. Vine Street, Des Moines, Iowa. This project shall be fully completed not later than November 15, 2022, and in accordance with the Completion Provisions.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents