Similar Projects
District Wide Asset Maintenance Contract for the Management and Maintenance of all State Roads and structures in Escambia County
Term Contract
Bidding
$33,850,000 est. value
Cantonment, FL

CR97 and CR297A Intersection Improvements
Infrastructure
Bidding
$800,000 est. value
Pensacola, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Resurfacing
Infrastructure
Post-Bid
$9,179,577 est. value
Bellview, FL

Design-Bid-Build Paving Indefinite Delivery Indefinite Quantity Single Award Construction Contract for the Naval Air Station Pensacola Florida Area of Responsibility
Results
$15,000 to $1,000,000 est. value
Pensacola, FL 32508

CR 95A and Old Chemstrand Road Intersection Improvements
Results
Pensacola, FL 32502

Myrtle Grove Gully Restoration Construction
Infrastructure
Bidding
$600,000 est. value
Pensacola, FL

Asphalt Plant Mix and Tack Coat
Results
FL

Safety Project/Milling and Resurfacing/Drainage Improvements/Base Work
Infrastructure
Bidding
$4,635,992 est. value
Molino, FL 32577

General Paving and Drainage
Results
FL

Resurfacing Project
Results
Less than $5,100,000 est. value
FL

Intersection Improvements in Plant City, Lithia, and Riverview Areas
Results
$3,901,420 est. value
Lithia, Plant City, Riverview, FL

Resurfacing/Reconstruct Concrete Pavement/Drainage Improvements
Results
$5,233,136 est. value
FL

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

Milling and Resurfacing - SR 750
Infrastructure
Results
$2,586,524 est. value
FL

Reported 06/28/2022 12:00 AM
Project Title

Main Street Hashtag Connector Phase I

Physical Address View project details and contacts
City, State (County) Pensacola, FL 32502   (Escambia County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is Phase One of three phases and consists of the complete street revitalization of Main Street between Alcaniz Street and Baylen Street in down town Pensacola. The City of Pensacola desires to create more connected public spaces that highlight the local attributes of the City’s historic waterfront. The City has identified the Hashtag Connector Project as a catalyst project that enhances its economic development, links to existing assets, brings its citizens to the water, and connects east and west with a continuous waterfront trail. Phase One involves the milling and overlay of existing asphalt pavement, the removal, realignment and replacement of existing curb and gutter, the creation of center islands, landscaping, hardscaping, striping, signage, east and west bound protected bike lanes, and a new traffic signal at the intersection of Jefferson Street and Main Street.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents