Similar Projects
Comprehensive Infrastructure for Tampa’s Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Water Meter Replacements
Post-Bid
Jennings, FL 32053

Water System Improvements
Post-Bid
Less than $400,000 est. value
Caryville, FL 32427

46--Water Purification System
Results
Palm Beach Gardens, FL 33410

Downtown Utility Replacements
Results
Less than $740,000 est. value
Dunnellon, FL

South Middle River Forcemain Crossing Design Build
Term Contract
Construction
Less than $45,000 est. value
Fort Lauderdale, FL 33301

Utility Metering
Term Contract
Post-Bid
Orlando, FL 32816

F--Water Chlorine, Bldg Monitoring
Results
Orlando, FL 32827

450 Fire Hydrant Meter 3
Post-Bid
Homestead, FL 33030

N--Domestic Water Isolation (Shutter) Valves (Va-19-00034342)
Results
Palm Beach Gardens, FL 334106400

Advanced Metering Infrastructure (AMI)
Post-Bid
Sarasota, FL 34230

Sable Creek Potable Water Improvements
Results
FL

Water Production 24" Dezurik Valves Rebuild or Repair
Post-Bid
Tampa, FL 33602

Regional Integrated Loop System Phase 3B Interconnect (Preymore to SR 72)
Results
$12,092,815 est. value
FL

Construction Services for Veranda Preserve West Phase 2 Infrastructure Improvements
Post-Bid
Port Saint Lucie, FL 34953

Last Updated 12/23/2019 09:21 AM
Project Title

High Point Subdivision Water Main Replacement

Physical Address View project details and contacts
City, State (County) Stuart, FL 34996   (Martin County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes all work necessary for the abandonment of existing 6” and 4” asbestos cement pipe (ACP) water mains presently located in West High Point Road, East High Point Road, Delano Lane, back lot areas, and Island Road. All water mains will be replaced with 6” and 8” HDPE and PVC water main to be located in the right of ways for West High Point Road, East High Point Road, Middle Road, Delano Lane and Island Road. Water main abandonment will be by grouting and abandoning in-place utilizing Best Management Practices to minimize breakage during any required removal and disposal of pipe. The plan includes adding Fire Hydrants and restoring the Public ROWs and Private Properties during this construction.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents