Similar Projects
Rowen Phase 1 Roads and Infrastructure
Infrastructure
Design
$18,000,000 est. value
Dacula, GA

Blastec - Site Only
Renovation
Design
Cumming, GA 30041

Commercial Properties Re-Development
Infrastructure
Bidding
Morrow, GA 30260

Stone Industrial Park Phase A
Infrastructure
Bidding
$1,300,000 to $1,600,000 est. value
GA

Southbridge Infrastructure Improvements
Post-Bid
GA

Chamblee Plaza Redevelopment Storm Water System
Renovation
Post-Bid
Chamblee, GA 30341

Walking Trail at Meridian Park
Results
Loganville, GA 30655

Site Prep for Pre-Fab Restrooms
Results
Ellenwood, GA 30294

Perimeter Marketplace
New Construction - 60,400 SF
Construction
Dunwoody, GA 30338

Kipp Vision Modular Health Clinic
New Construction
Construction
Atlanta, GA 30315

FY-2023 Site Work (Hardscape, Landscape, Utility) Task Order Services
Infrastructure
Bidding
Less than $5,000,000 est. value
Atlanta, GA 30332

Site Improvements for New Building - Harlem High School
Post-Bid
Harlem, GA 30814

Duluth High School - Softball Stadium and Site Preparation
Results
Duluth, GA 30096

CVS #4190
Construction
Toccoa, GA 30577

Site Improvements for Euchee Creek Elementary School
Infrastructure
Bidding
Grovetown, GA 30813

Reported 12/17/2021 12:00 AM
Project Title

Electric Utility Right-Of-Way Clearing

Physical Address View project details and contacts
City, State (County) Covington, GA   (Newton County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Clearing of nineteen (19) electric distribution circuits out of seven (7) substations. The City of Covington desires to engage a private tree trimming contractor to perform distribution line clearing and tree removal typical to electric distribution lines both in rural and urban environments. The nineteen (19) circuits referenced herein comprises approximately 430 linear miles of right of-way. Clearing must consist of a minimum of 108 linear miles and not to exceed a maximum of 115 linear miles

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Selective Tree and Shrub Removal and Trimming, Selective Tree and Shrub Trimming, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents