Similar Projects
SCBI Utility Upgrade Phase III - Priority D
Results
Front Royal, VA 22630

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Various Sizes of MJ Gate Valves
Results
Front Royal, VA 22630

Waterline Upgrades Construction Services
Results
Front Royal, VA

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

Case Coal, Llc Bond Forfeiture
Alteration
Results
$110,000 to $180,000 est. value
Duffield, VA 24244

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

Multi-Use Trail Construction Projects
Infrastructure
Results
$400,000 CJ est. value
Hillsboro, VA 20132

Pressure Reducing Valve (PRV) Vault
Alteration
Results
Front Royal, VA 22630

Blue Heron Landing Park
Infrastructure
Post-Bid
$775,000 CJ est. value
Chesapeake, VA 23325

Clerk of Works Redundant Waterline
Term Contract, Infrastructure
Post-Bid
Front Royal, VA

St. Dominics Monastery Chapel
New Construction, Infrastructure - 11,000 SF
Design
$3,600,000 CJ est. value
Linden, VA 22642

Modular Landfill Office Building
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Bentonville, VA 22610

Sanitary Sewer Lining
Infrastructure
Bidding
$430,000 CJ est. value
Front Royal, VA 22630

Sanitary Sewer Lining
Infrastructure
Bidding
$430,000 CJ est. value
Front Royal, VA 22630

Last Updated 10/12/2022 02:12 PM
Project Title

Parallel Waterline for the Route 522 North Corridor

Physical Address View project details and contacts
City, State (County) Front Royal, VA 22630   (Warren County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $17,380,607 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of October 12, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** The Work includes installation of approximately 26,000 linear feet of new 12-inch water main, approximately 1,000 linear feet of 24-inch and larger steel casing pipe via jack and bore, approximately 555 linear feet of 48-inch steel casing pipe via microtunneling, construction of a 2.12 MGD water pump station, and associated appurtenances in Front Royal, Virginia. All questions about the meaning or intent of the Bidding Documents are to be directed to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda electronically. Questions received less than seven (7) days prior to the date for opening of Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Direct questions to Engineer VIA E-MAIL ONLY at: CHA Consulting, Inc. Attn: Eric Anderson, P.E. eanderson@chacompanies.com Bid results - Contract 1 - Snyder Environmental Services - $ 15,379,870.00 Contract 2 - Snyder Environmental Services - $ 2,000,737.00

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents