Similar Projects
Gaskins Road Embankment Repair Project-JSEB Set-Aside
Post-Bid
Jacksonville, FL

Crystal Cove Court Underdrain Repair Project
Post-Bid
Jacksonville, FL

Roadside Ditch Cleaning and Rehabilitation - Pre-Qualified Horizontal Construction
Term Contract
Results
Less than $1,069,547 est. value
Jacksonville, FL 32202

Reservoir Lane Underdrain Improvement Project
Results
Less than $99,940 est. value
Jacksonville, FL 32202

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

TMT Rehab Concrete Outfall Pipe at 22+30
Results
Jacksonville, FL

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Longview Drive South Drainage Improvements-JSEB Set Aside
Results
Jacksonville, FL

Design-Build Services for Horizontal/Civil Engineering (Horizontal) Projects
Infrastructure
Post-Bid
Jacksonville, FL

Cathodic Protection
Results
Less than $3,823,389 est. value
FL

Jack Horner Lane Underdrain Improvement Project
Infrastructure
Post-Bid
Jacksonville, FL 32210

August Drive Bridge Sheet Pile Walls Replacement at Dames Point Marine Terminal
Results
Less than $2,300,000 est. value
Jacksonville, FL 32099

Ocean Terrace Drainage Improvements Phase 1 - American Avenue to South Beach Parkway and South Sedimentation Basin Weir Repairs
Infrastructure
Post-Bid
$3,400,000 to $3,700,000 est. value
Jacksonville Beach, FL 32250

Ballinger Drive Underdrain Repair
Results
Less than $55,314 est. value
Jacksonville, FL 32202

Upland DMMA Construction Phase I
Results
Less than $5,000,000 est. value
Jacksonville, FL 32206

Last Updated 09/01/2021 09:47 AM
Project Title

Woolery Drive Drainage Improvements Phase I

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32211   (Duval County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of furnishing all labor, materials, and equipment and performing all operations necessary for construction of a new box culvert under Arble Road, including drainage inlets, grassed swales, JEA water main adjustment, and pavement repair and striping.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents