Similar Projects
OCA CON ERFO Road Construction FL
Alteration
Design
$1,000,000 to $5,000,000 est. value
Silver Springs, FL

NW 49/35 Street - Phase 2B (from N Boundary of Pit to NE 35 Street Phase 2A)
Infrastructure
Bidding
Ocala, FL 34475

SE 47th Avenue Resurfacing (from CR 42 to CR 484)
Infrastructure
Bidding
$1,042,000 est. value
Ocala, FL 34471

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Barli Acres Road Improvement Project
Infrastructure
Post-Bid
$150,000 est. value
FL

Transportation Rehabilitation Improvement Program
Results
Ocala, FL 34471

Annual Sidewalk Repair and Maintenance
Results
Ocala, FL

LDS Church - Ocala Stake Suite and Parking Lot Additions
Addition - 1,700 SF
Construction
Ocala, FL 34471

FedEx Ocala Hub Parking Expansion
Addition
Construction
Ocala, FL 34475

Rainbow Parks Units 1 and 2 Road Grading 2021
Term Contract, Infrastructure
Bidding
$60,000 est. value
FL

SE 49th Street Road/SE 180th Avenue Road (from CR 314A to 95th Street Road)
Infrastructure
Post-Bid
$2,250,000 est. value
Ocala, Ocklawaha, FL 34480

Asphalt Pavement Repair
Results
Less than $820,000 est. value
FL

Babe Ruth ADA Sidewalk Improvements
Infrastructure
Bidding
$150,000 est. value
Ocala, FL 34480

21B-210 SE 59th Street Resurfacing (South Magnolia Avenue to South Pine Avenue)
Infrastructure
Post-Bid
$794,000 est. value
Ocala, FL 34483

2020 Silver Springs Shores Resurfacing Project
Results
Less than $1,050,000 est. value
FL

Last Updated 08/23/2021 10:46 AM
Project Title

SW 49th Court Road - Phase 1A (Segment A) (From CR 484 Northward to SW 128th Street)

Physical Address View project details and contacts
City, State (County) FL   (Marion County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct a new 4-lane urban roadway with ROW, travel lanes, paved shoulder, raised grassed median, sidewalk, Shared Use Path, new drainage system, signing and pavement markings, and a permanent traffic signal at Marion Oaks Trail.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents