Similar Projects
Resurfacing- SR 5 (US 1)
Infrastructure
Bidding
$12,773,126 est. value
FL

St. Michael Place Extension Phase 3
Post-Bid
Melbourne, FL 32901

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Pineapple Complete Streets Project
Results
$1,119,730 est. value
Melbourne, FL 32935

Front Street Complete Streets Project
Results
Melbourne, FL 32901

FPL Cocoa Service Center Paving Improvements
Alteration
Post-Bid
Cocoa, FL 32922

Asphalt Sealing, Rejuvenation, and Striping
Term Contract
Results
Melbourne, FL 32940

Silicone Joint Sealer
Infrastructure
Post-Bid

Pavement Repair - Titusville High School
Results
Titusville, FL 32780

Evaluation of Enhanced-Friction Asphalt Overlays and Surface Treatments
Infrastructure
Post-Bid

Road Bond Paving - Unit 17
Results
Less than $1,987,130 est. value
Palm Bay, FL 32907

District Five Ocala Operations Center Asphalt, Mill, Overlay, Parking Lot Striping
Infrastructure
Post-Bid

Road Bond Paving - Units 1, 2, 3, 4, 27, 35, 43 and 47
Results
Less than $4,310,375 est. value
Palm Bay, FL 32907

Pave Tom Lawton Access Road
Results
Less than $125,000 est. value
Palm Bay, FL

Road Bond Paving Port Malabar Road - Turkey Creek to Railroad Tracks
Results
Less than $1,405,881 est. value
Palm Bay, FL 32907

Last Updated 04/12/2022 08:11 AM
Project Title

Road Bond Paving - Unit 48 and Emerson Drive

Physical Address View project details and contacts
City, State (County) Palm Bay, FL 32907   (Brevard County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,800,328
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of Full Depth Reclamation (FDR), milling and paving and thin asphalt overlay in Units 48 and Emerson Drive from C-1 canal to Fairhaven in the City of Palm Bay. Full Depth Reclamation will include design mix for cement and emulsion and the paving will be 1.5” asphalt for local street and 2” thick for collector roads. Construction shall include all incidental items for work to be performed as per the construction plans for Unit 48 and Emerson Drive

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents