Similar Projects
Last Updated | 07/26/2021 10:54 AM |
Project Title | NE 35th Avenue Roadway and Water Main Improvements |
Physical Address | View project details and contacts |
City, State (County) | North Miami Beach, FL (Miami-Dade County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. The general location of the work is within the right-of-way of NE 35th Avenue between NE 171st Street and NE 163rd Street with connections to existing infrastructure within intersecting rights of-way of NE 171st Street, NE 170th Street, NE 169th Street, NE 168th Street, NE 167th Street, NE 166th Street, NE 165th Street, NE 164th Street and NE 163rd Street all within the Eastern Shores Neighborhood of North Miami Beach, Florida. 2. The work of this Contract comprises the installation of 8-in, 12-in, 16-in, and 20-in water main pipe, storm drainage, roadway and walkway restoration and construction, landscape relocation and improvements, irrigation system installation and pavement marking and signage installation, and minor electrical improvements per the document provided in the solicitation package directly from the City. The water main installation work shall be installed by a combination of open trench, horizontal directional drill and pipe bursting methods as depicted in the Project Drawings. New water main pipe material shall be HDPE. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |