Similar Projects
Explorer Middle School Additions and Partial Replacements - Mukilteo School District
Addition, Demolition, Renovation, Infrastructure
Conception
$30,000,000 CJ est. value
Everett, WA 98204

Explorer Middle School Additions and Partial Replacements - Mukilteo School District
Addition, Demolition, Renovation, Infrastructure
Conception
$30,000,000 CJ est. value
Everett, WA 98204

I-405/SR 522 to SR 527 - Widening and Express Toll Lane
Infrastructure
Design
$510,000,000 CJ est. value
Bothell, WA 98012

SR 524/Olympic Ave Vic To 48th Ave W Vic - ADA Compliance
Infrastructure
Design
$2,296,000 CJ est. value
Snohomish, WA 98296

Kent Prairie Elementary Site Access
Renovation
Bidding
$1,000,000 CJ est. value
Arlington, WA 98223

RFQ D/B - Arlington Operations Center Redevelopment Design Build Services
New Construction, Term Contract, Infrastructure
Bidding
$35,000,000 CJ est. value
Arlington, WA 98223

Mariner High School Renovation and Addition - Bid Pkg Group 1
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$11,367,521 CJ est. value
Everett, WA 98204

Mariner High School Renovation & Addition - Bid Pkg Group 2
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$5,094,243 CJ est. value
Everett, WA 98204

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

Whitehorse Trail Improvements
Renovation, Alteration
Post-Bid
WA

Tower Site Readiness Phase III Project
Infrastructure
Results
Arlington, Bothell, Darrington, Everett, Monroe, WA 98241

Swift Brt Orange Line Construction
Infrastructure
Results
Everett, WA 98201

Northwest Washington Rehab Hospital
New Construction, Infrastructure - 52,500 SF
Pending Verification
$15,000,000 CJ est. value
Lynnwood, WA 98087

North Creek Commerce Center
Demolition, New Construction, Infrastructure - 250,000 SF
Pending Verification
$100,000,000 CJ est. value
Bothell, WA 98012

270th Street NW Self Storage Facility
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Stanwood, WA 98292

Last Updated 02/13/2023 07:03 PM
Project Title

Serene Lake Elementary Additions and Partial Replacements - Mukilteo School District

Physical Address View project details and contacts
City, State (County) Edmonds, WA 98026   (Snohomish County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Additions and partial replacements for the Serene Lake Elementary School. A more detailed scope is estimated to be released on a future date. As of February 13, 2023, Information regarding design team and contractor selection has not been disclosed. Construction is estimated to take place in 2023.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents