Similar Projects
Park Vista at El Tesoro Lift Station Facilities
New Construction
Bidding
Houston, TX 77083

1.40 MGD Wastewater Treatment Plant No. 2 Expansion and Lift Station
Addition
Bidding
Humble, TX 77396

Booster Pump Replacement Project
Post-Bid
Bellaire, TX

Inspection, Maintenance, Repair and Related Items of Lift Station
Term Contract
Post-Bid
Less than $220,000 est. value
Houston, TX

Booster Pump Replacement
Results

Newport Pointe Lift Station Phase 1
Results
TX

SL0008 - Pump Station and Drainage System Cleaning
Infrastructure
Bidding
$296,433 est. value
TX

Reclaimed Water Pump Station
New Construction
Post-Bid
$1,070,000 est. value
TX

Existing Lift Station Nos. 2 and 3 Electrical Modifications, Generator, and Motor Control Center Replacement
Results
$300,000 est. value
Houston, TX 77040

Lift Station No. 1 FEMA Replacement and Mitigation
New Construction
Bidding
Houston, TX 77084

Lift Station No. 8 Force Main Replacement
Infrastructure
Post-Bid
$279,815 est. value
The Woodlands, TX

Marvida Lift Station No. 1
Results
Less than $987,000 est. value
TX

HPW - Lift Station Renewal and Replacement Package II
Renovation
Bidding
$4,038,405 est. value
Houston, TX

Grease Trap and Lift Station Services
Infrastructure
Post-Bid
Pasadena, TX

HPW-Abandonment of Bering and San Felipe Lift Stations
Results
$20,573,123 est. value
Houston, TX 77002

Last Updated 03/03/2022 04:45 AM
Project Title

Sunterra Lift Station No. 2

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $911,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of providing the necessary labor, materials, equipment and supervision, and plant to construct Sunterra Lift Station No. 2 including but not limited to, mobilization, bonds and insurance; construction of an eight-foot (8’) diameter cast-in-place concrete wet well including 100% solids epoxy coating, well point system and dewatering as necessary; two (2) submersible pumps with all accessories, riser piping, valves, coatings, fence and gates, concrete pavement, site work, 24-inch (24”) on-site storm piping and storm inlet, 6-inch (6”) and 12-inch (12") on-site sanitary sewer piping including well pointing and dewatering as necessary, 35-kW diesel engine driven generator, sound attenuated weatherproof level 2 enclosure and 24-hour integral storage tank, generator concrete pad, automatic transfer switch, load bank testing, lift station control panel, automatic telephone dialer, electrical service disconnect switches, conduit, wire, and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station.

Details

Lift and Pump Stations, Addition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents