Similar Projects
Dam Rehabilitation - Construction - Hibernia Dam, Chester, PA
Design
$500,000 to $1,000,000 est. value
PA 19320

Reservoir Sluice Gate Replacement
Bidding
Ebensburg, PA 15931

Armstrong Tunnels Construction Management & Inspection
Post-Bid
Pittsburgh, PA

Installing Waterway Safety Booms, Allegheny River L/D No. 2 & Dashields L/D
Post-Bid
$1,000,000 to $5,000,000 est. value
Pittsburgh, PA 15222

Donegal Lake - Dam Improvements
Results
$5,000,000 to $10,000,000 est. value
PA

Rehabilitate Pecks Pond Dam
Results
$2,000,000 to $5,000,000 est. value
Dingmans Ferry, PA 18328

Structural Repairs
Construction
$4,800,000 est. value
Pittsburgh, PA 15123

Diagnostic and Repair of Dams
Post-Bid
PA

Foster Joseph Sayers Dam-Howard Levee Conduit Remediation
Results
$500,000 to $1,000,000 est. value
PA

Somerset Lake Dam
Post-Bid
$5,000,000 to $10,000,000 est. value
Somerset, PA

Town of Bloomsburg Flood Risk Management Expansion, Contract No. 2 Electrical Construction
Results
$300,000 to $600,000 est. value
PA

Marquette Lake Dam - Improvements to Marquette Lake Dam
Post-Bid
Less than $8,500,000 est. value
Harrisburg, PA

Pine Grove Dam Tainter Gate Improvements and Full Lift Test Project
Results
$1,500,000 to $2,500,000 est. value
Chester, PA 19016

Cowanesque Dam Spillway Repairs, Tioga County, PA
Post-Bid
$500,000 to $1,000,000 est. value
Lawrenceville, PA 16929

Town of Bloomsburg Flood Risk Management Expansion Project
Results
Bloomsburg, PA

Last Updated 01/09/2019 01:04 PM
Project Title

Town of Bloomsburg Flood Risk Management Expansion, Contract No. 1 General Construction

Physical Address View project details and contacts
City, State (County) PA   (Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $15,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The Project generally consists of the construction of an earthen levee system including 4,400-feet of earth levee, three (3) roadway stop-log closure structures, two (2) storm water pump stations 30,000 GPM each, two (2) sanitary pump stations including a 10 MGD station and a 55,000 GPD packaged duplex grinder station, 2,600 lineal feet of 48-inch storm water SLCPP, storm water control manholes including sluice gates, sanitary sewer line work, utility coordination and possible relocations during construction, and portable closure systems. Separate bids shall be received for CONTRACT NO. 1 - GENERAL CONSTRUCTION and CONTRACT NO. 2 - ELECTRICAL CONSTRUCTION.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents