Similar Projects
Dam Rehabilitation - Construction - Hibernia Dam, Chester, PA
Design
$500,000 to $1,000,000 est. value
PA 19320

Reservoir Sluice Gate Replacement
Bidding
Ebensburg, PA 15931

Armstrong Tunnels Construction Management & Inspection
Post-Bid
Pittsburgh, PA

Installing Waterway Safety Booms, Allegheny River L/D No. 2 & Dashields L/D
Post-Bid
$1,000,000 to $5,000,000 est. value
Pittsburgh, PA 15222

Donegal Lake - Dam Improvements
Results
$5,000,000 to $10,000,000 est. value
PA

Rehabilitate Pecks Pond Dam
Results
$2,000,000 to $5,000,000 est. value
Dingmans Ferry, PA 18328

Structural Repairs
Construction
$4,800,000 est. value
Pittsburgh, PA 15123

Diagnostic and Repair of Dams
Post-Bid
PA

Town of Bloomsburg Flood Risk Management Expansion, Contract No. 1 General Construction
Results
$10,000,000 to $15,000,000 est. value
PA

Somerset Lake Dam
Post-Bid
$5,000,000 to $10,000,000 est. value
Somerset, PA

Town of Bloomsburg Flood Risk Management Expansion, Contract No. 2 Electrical Construction
Results
$300,000 to $600,000 est. value
PA

Marquette Lake Dam - Improvements to Marquette Lake Dam
Post-Bid
Less than $8,500,000 est. value
Harrisburg, PA

Pine Grove Dam Tainter Gate Improvements and Full Lift Test Project
Results
$1,500,000 to $2,500,000 est. value
Chester, PA 19016

Cowanesque Dam Spillway Repairs, Tioga County, PA
Post-Bid
$500,000 to $1,000,000 est. value
Lawrenceville, PA 16929

Town of Bloomsburg Flood Risk Management Expansion Project
Results
Bloomsburg, PA

Last Updated 10/30/2019 03:11 PM
Project Title

Foster Joseph Sayers Dam-Howard Levee Conduit Remediation

Physical Address View project details and contacts
City, State (County) PA   (Centre County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Project Description: Sayers Dam is located approximately 20 minutes by vehicle from Lock Haven, Pennsylvania. The Howard Levee system is located approximately four miles upstream from the main dam embankment. All construction will be on the levee embankment. The purpose of this contract is to slip line the two deteriorated 48-inch diameter corrugated metal pipes that provide interior drainage for the Borough of Howard. The grouted 42-inch outside diameter HDPE liner system requires design by a professional engineer and is to be installed per the liner manufacturer's specifications. Work includes terminations of the slip lining at the intake structures, control manholes, and outlet structures. To comply with the reservoir drawdown, it will be necessary to complete the exterior slip lining for Drainage Structure A between approximately 1 March and 1 April when the reservoir is at approximately Elevation 610.0. Construction of the exterior slip lining for Drainage Structure B can be completed after the initial winter drawdown to elevation 625 feet beginning approximately 1 December and 1 April of each year. Drainage Structure A is approximately 340 linear feet and Drainage Structure B is approximately 270 linear feet.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents