Similar Projects
Miro Corners Parking
New Construction
Conception
$665,468 est. value
Hollywood, FL 33314

Safety D/B Push Button for WWD Devices at Interstate Ramps
Bidding

Interchange Improvement
Bidding
$1,013,754 est. value
FL

Widen/Resurface Exist Lanes/Sidewalk/Bicycle Lanes
Post-Bid
Less than $1,378,994 est. value
FL

District Office Asphalt Repair and Installation at three Onsite Locations
Post-Bid
Coral Springs, FL

Sidewalk Restoration Services
Term Contract
Results
Miramar, FL

Breakers Avenue Streetscape & Infrastructure Improvements Project
Results
$7,000,000 to $8,000,000 est. value
Fort Lauderdale, FL 33301

College Avenue Phase II Roadway Improvements
Bidding
$1,900,000 est. value
Davie, FL 33324

Public Private Partnership Redevelopment Opportunity for the Hollywood Beach Culture and Community Center
New Construction - 20,000 SF
Post-Bid
Hollywood, FL 33019

CDBG Sidewalk Improvement Project
Results
Deerfield Beach, FL 33441

Stunson Nature Trail - Planting Buffer and Viewing Platform
Bidding
Oakland Park, FL 33309

Sidewalk Restoration Services
Post-Bid
Miramar, FL 33025

Broward MPO Regional Complete Streets Initiative
Results
FL

Trail Repairs - Miscellaneous Locations
Bidding
$100,000 est. value
Davie, FL

Construction Management at Risk Services
Post-Bid
Hollywood, FL 33022

Last Updated 04/30/2020 08:57 AM
Project Title

Bike Lane/Sidewalk/Milling and Resurfacing/Pavement Markings

Physical Address View project details and contacts
City, State (County) FL   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,315,758
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consist of, but not limited to, milling and resurfacing, concrete (curb, curb and gutter,sidewalk and driveways), signing (single post), pavement markings (painted and thermoplastic, detectable warnings), manhole adjustments, selective clearing and grubbing(tree removal, tree protection, branch pruning), pull boxes, and sod, along NW 62nd. Section 0001 Roadway 0101- 1- Mobilization (43783015201) Ls 1.000 0102- 1- Maintenance Of Traffic (43783015201) Ls 1.000 0102- 14- Traffic Control Officer Hr 48.000 0102- 60- Work Zone Sign Ed 16,216.000 0102- 74- 1 Channelizing Device- Types i, Ii, Di, Vp, Drum, Or Lcd Ed 63,289.000 0102- 74- 7 Channelizing Device- Pedestrian Lcd (Longitudinal Channelizing Device) Lf 222.000 0102- 76- Arrow Board / Advance Warning Arrow Panel Ed 1,186.000 0102- 99- Portable Changeable Message Sign, Temporary Ed 388.000 0104- 18- Inlet Protection System Ea 39.000 0110- 2- 2 Selective Clearing And Grubbing, Areas With Trees To Remain Ac 0.730 0110- 4- 10 Removal Of Existing Concrete Sy 1,948.000 0120- 1- Regular Excavation Cy 1,154.700 0285-715- Optional Base, Base Group 15 Sy 1,155.000 0327- 70- 6 Milling Exist Asph Pavt, 1 1/2" Avg Depth Sy 33,733.000 0334- 1- 13 Superpave Asphaltic Conc, Traffic c Tn 95.300 0337- 7- 83 Asphalt Concrete Friction Course,Traffic c, Fc-12.5, Pg 76 -22 Tn 2,872.500 0425- 5- Manhole, Adjust Ea 10.000 0520- 1- 10 Concrete Curb & Gutter, Type f Lf 704.000 0520- 2- 4 Concrete Curb, Type d Lf 4,653.000 0522- 1- Concrete Sidewalk And Driveways, 4" Thick Sy 390.000 0522- 2- Concrete Sidewalk And Driveways, 6" Thick Sy 416.000 0527- 2- Detectable Warnings Sf 345.000 0570- 1- 2 Performance Turf, Sod Sy 5,983.000 0999- 25- Initial Contingency Amount, Do Not Bid (43783015201) Ls 1.000 Section 0002 Signing 0700- 1- 11 Single Post Sign, f&i Ground Mount, Up To 12 Sf As 19.000 0710- 11-290 Painted Pavement Markings, Standard, Yellow, Island Nose Sf 388.000 0710- 90- Painted Pavement Markings, Final Surface (43783015201) Ls 1.000 0711- 11-123 Thermoplastic, Standard, White, Solid, 12" For Crosswalk And Roundabout Lf 1,401.000 0711- 11-125 Thermoplastic, Standard, White, Solid, 24" For Stop Line And Crosswalk Lf 208.000 0711- 11-141 Thermoplastic, Standard, White, 2-4 Dotted Guideline/ 6-10 Gap Extension, 6" Gm 0.750 0711- 11-160 Thermoplastic, Standard, White, Message Or Symbol Ea 5.000 0711- 11-170 Thermoplastic, Standard, White, Arrow Ea 61.000 0711- 11-224 Thermoplastic, Standard, Yellow, Solid, 18" For Diagonal Or Chevron Lf 3.000 0711- 11-241 Thermoplastic, Standard, Yellow, 2-4 Dotted Guide Line /6- 10 Dotted Extension Line, 6" Gm 0.167 0711- 14-125 Thermoplastic, Preformed, White, Solid, 24" For Crosswalk Lf 517.000 0711- 14-160 Thermoplastic, Preformed, White, Message Ea 33.000 0711- 14-170 Thermoplastic, Preformed, White, Arrow Ea 33.000 0711- 16-101 Thermoplastic, Standard-Other Surfaces, White, Solid, 6" Gm 2.512 0711- 16-102 Thermoplastic, Standard-Other Surfaces, White, Solid, 8" Gm 0.018 0711- 16-131 Thermoplastic, Other Surfaces, White, Skip, 6",10-30 Skip Or 3-9 Lane Drop Gm 1.271 0711- 16-133 Thermoplastic, Standard-Other Surfaces White, Skip, 12"- Approach To Toll Plaza Or 3-9 Lane Drop Gm 0.069 0711- 16-201 Thermoplastic, Standard-Other Surfaces, Yellow, Solid, 6" Gm 1.359 0920-711- 3 Green Colored Pavement Marking, Bike Lane, Project 437830-1-52-01 Sf 5,080.000 Section 0003 Signalization 0635- 2- 11 Pull & Splice Box, f&i, 13" x 24" Cover Size Ea 5.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents