Similar Projects
SR 25 (US 27) from N. of SR 540 to N. of Kokomo Road, Polk County
Infrastructure
Bidding
$24,701,555 est. value
Dundee, FL 33838

Milling and Resurfacing
Infrastructure
Bidding
$1,792,762 est. value
Lake Alfred, FL 33850

2021 Pavement Resurfacing Project
Post-Bid
Winter Haven, FL

Construction Services for Project Improvements (Phase 2)
Post-Bid
Lakeland, FL

Avenue C, SW Complete Street Project
Results
$1,419,000 est. value
Winter Haven, FL 33880

Railroad Crossing Asphalt Repairs
Results
Less than $46,461 est. value
Frostproof, FL 33843

Milling and Resurfacing
Infrastructure
Bidding
$2,020,167 est. value
FL

Cascades Phase 2 Improvements
Post-Bid
Haines City, FL

Street Resurfacing
Results
$100,890 est. value
Lake Alfred, FL 33850

Design-Build - SR 35 (US 98) from North of West Socrum Loop Road to South of CR 54
Infrastructure
Bidding
$108,000,000 est. value
Lakeland, FL 33812

Brentwood Phase 1 Improvements
Post-Bid
Haines City, FL

Lakeland Park Drive Connector (from Lakeland Park Drive to Carpenters Way)
Results
$5,727,945 est. value
Lakeland, FL 33809

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Osprey Unit Road Capping
Results
Less than $130,000 est. value
Polk City, FL

2022 Pavement Resurfacing
Infrastructure
Post-Bid
Winter Haven, FL

Reported 07/13/2022 08:12 AM
Project Title

Marigold Avenue Roundabouts - Osceola County

Physical Address View project details and contacts
City, State (County) Poinciana, FL 34758   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected October 2024
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Poinciana, Florida. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. This intersection safety improvement project includes four separate intersections along Marigold Avenue in Osceola County. The four intersections are Marigold Avenue and San Lorenzo Road, San Miguel Road, Laurel Avenue, and Peabody Road. The total project length is approximately 1.45 miles. A new single lane roundabout is proposed at the intersections of Marigold Avenue at Peabody Road, Laurel Avenue, and San Lorenzo Road, to slow traffic and create a more pedestrian friendly environment. A new northbound left-turn lane at the intersection of Marigold Avenue and San Miguel Road is proposed to ensure optimal traffic flow. Signage and pavement markings will also be included as part of the design. As of July 12, 2022, this project is in the conceptual phase. Information regarding a design team and the contractor selection has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to 4th quarter of 2024. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents