Similar Projects
Last Updated | 06/30/2023 03:03 PM |
Project Title | RFP D/B - SR 35 (US 98) From N of West Socrum Loop Rd to S of CR 54 |
Physical Address | View project details and contacts |
City, State (County) | Lakeland, FL 33812 (Polk County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Results, Request for Qualifications, Construction start expected August 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $122,650,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): 7 -- Drainage (all storm drains, pipe culverts, culverts, etc.) Selection Method : Adjusted Score Financial Management Numbers : 43667315201 SR 35 (US 98) From N of West Socrum Loop Rd to S of CR 54 TRC Members (Subject to Change) : David Turley Jay Wolfe Mark Peronto The Florida Department of Transportation (Department) has issued this Request for Proposal (RFP) to solicit competitive bids and proposals from Proposers for the widening of State Road 35 (US 98) from North of West Socrum Loop Road. to South of CR 54 in Polk County, a distance of 8.745 miles. The existing roadway is a 2-lane undivided facility. The improvements will widen the roadway to a 4-lane divided facility, with both suburban (Context Classification C3R) and rural (Context Classification C2) characteristics. Construct Signing and Pavement Markings (SP&M), Lighting and Signalization. Estimated Contract Time: 1,400 Days All questions for this project must be submitted through the Department's Bid Question and Answer website at: https://fdotwp1.dot.state.fl.us/BidQuestionsAndAnswers/ Reference appropriate Contract Number. You are responsible for monitoring this site for questions and answers throughout the procurement process. Advertisement Design-Build Project Specific Advertisement - E1V43 District : 01 Prequalification Requirements : Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): 7 - Drainage (all storm drains, pipe culverts, culverts, etc.) 10 -Flexible Paving 11 -Grading (includes clearing and grubbing, excavation, and embarkment). 15 -Hot plant-Mixed Bitum. Course (incl structural & surface ...) Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Types : 2.0-Proj Development & Environmental (PD&E) Studies 3.1-Minor Highway Design 3.2-Major Highway Design 3.3-Controlled Access Highway Design 4.1.1-Miscellaneous Structures 4.1.2-Minor Bridge Design 6.2-Traffic Signal Timing 6.3.1-Intelligent Trans Systems Analysis & Design 6.3.2- Intelligent Trans Systems Implementation 6.3.3- Intelligent Trans Traffic Engin. Communications 7.1-Signing, Pavement Marking & Channelization 7.2-Lighting 7.3-Signalization 8.1-Control Surveying 8.2-Design, Right of Way, Construction Surveying 8.3-Photogrammetric Mapping 8.4- Right of Way Mapping 9.1-Soil Exploration 9.2-Geotechnical Classification Lab Testing 9.3-Highway Materials Testing 9.4.1-Standard Foundation Studies 9.5-Geotechnical Specialty Lab Testing 15.0-Landscape Architect Selection Method : Adjusted Score Response Requested : Letter of Interest Maximum Number of Pages : 10 Financial Management Numbers : 43667315201 Project Description : SR 35 (US 98) FROM N OF WEST SOCRUM LOOP RD TO S OF CR 54 Contract Amount/Limit : $110,916,000.00 TRC Members (Subject to Change) : Jay Wolfe Mark Peronto Ryan Molloy Notes : Type Note General Design-Build Contract Notes This project is being re-advertised/deadline extended in accordance with procedure, due to low response. Please see the revised schedule dates for the advertisement response deadline. Firms that have already submitted Letters of Interest are not required to resubmit their letter of interest again. Link to District Design/Build Website District 1 - District One Design Build Contracts (fdot.gov) Schedule E1V43; 436673-1; SR 35 (US 98) from Socrum Loop Rd to CR 54; Virtual Pre-Proposal Meeting. Please join my meeting from your computer, tablet or smartphone. https://meet.goto.com/170043669 You can also dial in using your phone. United States: +1 (872) 240-3212 Access Code: 170-043-669 Advertisement Description The Florida Department of Transportation (Department) has issued this Request for Proposal (RFP) to solicit competitive bids and proposals from Proposers for the widening of State Road 35 (US 98) from North of West Socrum Loop Road. to South of CR 54 in Polk County, a distance of 8.745 miles. The existing roadway is a 2-lane undivided facility. The improvements will widen the roadway to a 4-lane divided facility, with both suburban (Context Classification C3R) and rural (Context Classification C2) characteristics. Construct Signing and Pavement Markings (SP&M), Lighting and Signalization. Estimated Contract Time: 1,400 Days Stipend Amount: $274,332.00 Financial Management Number: 436673-1-52-01 Special Notes: In accordance with Conflict-of-Interest Procedure for Department Contracts (Procedure 375-030-006), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District One Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. HNTB CORPORATION AIM ENGINEERING & SURVEYING, INC. FALLER DAVIS AND ASSOCIATES, INC. FLORIDA BRIDGE AND TRANSPORTATION, INC. INWOOD CONSULTING ENGINEERS, INC. TIERRA, INC. Budget Amount*: FY 22/23 $110,916,000.00 *This project is anticipated to utilize American Rescue Plan Act (ARPA) funds. For informational purposes only. Actual commitment and final execution of this contract is contingent upon an approved legislative budget and availability of funds. The Technical Review Committee for this project will be: Ryan Molloy, Mark Peronto and Jay Wolfe Bid Opening Notes District One Headquarters; 801 N. Broadway Ave. Bartow, FL 33830 at 11:00 AM. Technical Contact Notes Bid Q & A website: https://fdotwp1.dot.state.fl.us/BidQuestionsAndAnswers/Proposal.aspx/SearchProposal All questions for this project must be submitted through the Department's Bid Question and Answer website at: https://fdotwp1.dot.state.fl.us/BidQuestionsAndAnswers/ Contract Number: E1V43. You are responsible for monitoring this site for questions and answers throughout the procurement process. RFP / Attachments : E1V43-Draft RFP.pdf E1V43-Draft RFP 8.8.22.pdf Schedule - The times displayed are automatically adjusted for the time zone of your system : Type Date - Time Advertisement Date 8/09/2022 Response Deadline Date/Time 8/23/2022 02:30 am Phase I Selection Date/Time 9/13/2022 07:00 pm Pre-Proposal Meeting Date/Time 9/26/2022 06:30 pm Tech Proposal Due Date/Time 2/16/2023 03:30 am Bid Opening Date/Time 4/19/2023 08:30 pm Bid Price Due Date/Time 4/19/2023 08:30 pm Final Selection Date/Time 5/02/2023 07:00 pm Letters of Interest (LOI) are due by 5:00 p.m. Monday, August 22, 2022 FDOT - RFP D/B - SR 35 (US 98) From N of West Socrum Loop Rd to S of CR 54 |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |