Similar Projects
Patching and Resurfacing Program
Bidding
FL

Access Road Rehabilitation, Marianna Municipal Airport
Post-Bid
Less than $700,000 est. value
Marianna, FL 32447

Reconstruction of Roads Damaged by Hurricane Michael
Post-Bid
Sneads, FL 32460

County Road 278 Resurfacing Project (From SR 73 to SR 71)
Results
Less than $1,385,807 est. value
Marianna, FL 32448

Resurfacing
Results
Less than $4,494,255 est. value
FL

District 3 Asphalt Paving 2020
Post-Bid
FL

Keevers Road Paving Improvement Project
Results
Less than $660,000 est. value
Sneads, FL 32460

Old Cottondale Road - Roadway Improvement and Water System Improvements
Post-Bid
Marianna, FL 32447

Magnolia Street/Church Street Paving Project
Results
Less than $243,490 est. value
Cottondale, FL

Longview Road Reconstruction Project
Post-Bid
FL 32446

Resurfacing
Results
Less than $5,639,924 est. value

CR 277 (Piano Road) from CR 162 to SR 77
Post-Bid
FL

CDBG-NR Infrastructure Improvements
Results
Less than $663,000 est. value
Marianna, FL 32447

Annual Asphalt Paving and Asphat Pavement Repairs
Term Contract
Post-Bid
Marianna, FL

Paving Project at Apalachee Correctional Institution
Results
Sneads, FL 32460

Last Updated 02/18/2020 03:50 PM
Project Title

County Road 162 Resurfacing Project

Physical Address View project details and contacts
City, State (County) Marianna, FL 32448   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate - 08/21/19
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes resurfacing and re-construction of County Road 162 (Jacob Road) from State Road 75 to State Road 71. The section from SR 75 to CR 167 is 24 feet wide, and will have 4 foot paved shoulders added (except for the bridge). The section from CR 167 to SR 71 is only 20’ wide with 10’ lanes. This section will be widened to 24’ with 12’ lanes. The work also includes resurfacing and reconstruction of the road including reclaim existing asphalt, dig out and reconstruct the failed areas prior to reclaiming, 1-1/2 of structural asphalt and 1" surface or friction course. Shoulders will be paved 4' on each side of the road with base and 1-1/2" asphalt. The existing asphalt will be mixed in (reclaimed) to create a new base, a 1-1/2" structural course will be applied, and a 1" Friction Course will be applied using SP 9.5. Pipes will be replaced or extended as indicated and mitered ends or headwalls will be replaced. Ditches will be re-graded at pipe ends (to 100’ each direction) and as indicated on drawings. Areas where the base has failed will be dug out and repaired prior to reclaiming. In addition, the Chipola River Bridge joints will be cleaned and the seals will be replaced.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents