Similar Projects
Patching and Resurfacing Program
Bidding
FL

Access Road Rehabilitation, Marianna Municipal Airport
Post-Bid
Less than $700,000 est. value
Marianna, FL 32447

Reconstruction of Roads Damaged by Hurricane Michael
Post-Bid
Sneads, FL 32460

County Road 278 Resurfacing Project (From SR 73 to SR 71)
Results
Less than $1,385,807 est. value
Marianna, FL 32448

County Road 162 Resurfacing Project
Results
Marianna, FL 32448

District 3 Asphalt Paving 2020
Post-Bid
FL

Resurfacing
Results
Less than $4,494,255 est. value
FL

Old Cottondale Road - Roadway Improvement and Water System Improvements
Post-Bid
Marianna, FL 32447

Keevers Road Paving Improvement Project
Results
Less than $660,000 est. value
Sneads, FL 32460

Longview Road Reconstruction Project
Post-Bid
FL 32446

Resurfacing
Results
Less than $5,639,924 est. value

CR 277 (Piano Road) from CR 162 to SR 77
Post-Bid
FL

CDBG-NR Infrastructure Improvements
Results
Less than $663,000 est. value
Marianna, FL 32447

Annual Asphalt Paving and Asphat Pavement Repairs
Term Contract
Post-Bid
Marianna, FL

Paving Project at Apalachee Correctional Institution
Results
Sneads, FL 32460

Last Updated 04/03/2020 12:49 PM
Project Title

Magnolia Street/Church Street Paving Project

Physical Address View project details and contacts
City, State (County) Cottondale, FL   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $243,490
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the resurfacing of Magnolia Street from US 90 to Railroad Avenue along with the reconstruction of Church Street form US 231 to Magnolia Street for a total project length of 0.23 miles. Isolated cut and patch reconstruction will be necessary on Magnolia Street along with proposed radius widening. Clearing and grubbing, turnout construction and concrete sidewalk construction are also included in this project along with minor drainage improvements consisting of pipe culvert replacement and concrete inlet construction. This project also consists of ditch grading, shoulder work and grassing along with roadway sign replacement and pavement striping including thermoplastic markings to be placed on the final surface.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents