Similar Projects
2022 Bond - Proposition A - Winona Independent School District
Addition, Renovation, Infrastructure
Conception
$13,400,000 CJ est. value
Winona, TX 75792

2023 Bond - Jackson Elementary School - Chapel Hill Independent School District
New Construction, Infrastructure
Conception
$4,326,000 CJ est. value
Tyler, TX 75705

Hospitality Health ER Expansion
New Construction, Infrastructure - 26,000 SF
Design
$2,500,000 CJ est. value
Tyler, TX 75701

Wayfare Apartments / Leasing Office
New Construction, Infrastructure - 374,850 SF
Design
$36,559,544 CJ est. value
Tyler, TX 75703

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Medical Education Building - UT Tyler Health Science Center
New Construction, Infrastructure - 250,000 SF
Post-Bid
$150,000,000 CJ est. value
Tyler, TX 75701

Medical Education Building - UT Tyler Health Science Center
New Construction, Infrastructure - 250,000 SF
Post-Bid
$150,000,000 CJ est. value
Tyler, TX 75701

Wastewater Treatment Plant Chlorination / Dechlorination Improvements
Infrastructure, Renovation
Results
$3,661,620 CJ est. value
Tyler, TX 75703

Donna, Melinda and Mirabeau Street Improvements Subgrade Repair
Infrastructure
Results
$67,055 CJ est. value
Tyler, TX 75702

Dutch Bros Coffee (Shell Shack) / Dutch Bros / Tyler
New Construction, Infrastructure - 950 SF
Construction
$350,000 CJ est. value
Tyler, TX 75703

A-Affordable Storage / Bullard
New Construction, Infrastructure - 200,000 SF
Construction
$3,000,000 CJ est. value
Bullard, TX 75757

DK Convenience Store
New Construction, Infrastructure - 4,100 SF
Pending Verification
$2,000,000 CJ est. value
Tyler, TX 75702

Marsh Farm Road Commercial Development / Tyler
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Tyler, TX 75703

2023 Bond - Wise Elementary - Chapel Hill Independent School District
New Construction, Infrastructure
Conception
$3,998,000 CJ est. value
Tyler, TX 75707

Last Updated 03/21/2023 08:04 AM
Project Title

Renovation and Drainage Improvements, TYL Lab

Physical Address View project details and contacts
City, State (County) Tyler, TX 75702   (Smith County)
Category(s) Heavy and Highway, Laboratory, Sewer and Water
Sub-Category(s) Laboratory, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,001,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

PROPOSAL DOCUMENTS for this project are included with this advertisement. Package 1 Contract Documents MUST BE RETURNED AS YOUR PROPOSAL. Package 2 Standard Conditions, information only, does not need to be returned Package 3 Project Specifications, information only, does not need to be returned Package 4 Plans, information only, does not need to be returned Package 5 Third-Party Ethics Training, information only, does not need to be returned Package 6 HUB Instructions, information only, does not need to be returned Pre-qualification of contractors on facility contracts is waived; however, the Uniform General Conditions included in each proposal document outlines specific requirements for contract award. This project estimate is greater than or equal to $100,000; therefore, the use of a HUB Subcontracting Plan (HSP) is required and must be submitted with proposal package. All submitted bids will be publicly opened, only successful bids will be read. It is the bidder's responsibility to ensure that the proposal (required documents) arrives at the above location and in the hands of the letting official, by the specified bid date / time deadline regardless of the method chosen by the bidder for delivery. Award or rejection of this project will be made by the Texas Transportation Commission typically scheduled on the last Thursday of each month. The contract for this work will not be awarded to any contractor, firm or subcontractor currently debarred from bidding on Texas Department of Transportation projects. Usual rights reserved. Bidders are cautioned to study carefully the Standard Conditions documents for compliance with these requirements. The right is reserved by the Texas Transportation Commission to reject any and all proposals. Contractor must bid all Bid Items as called for on the plans and in the specifications. All bids received will be retained by the Texas Department of Transportation and will not be returned to bidders. Conditional bids will not be considered. The Texas Department of Transportation hereby notifies all bidders that the applicable State Laws prohibiting discriminatory practices in bidding and awarding this work will be strictly adhered to. ESTIMATED COST: $2,001,000.00 Work of this project includes: 1. Renovation of the existing DHQ Old Lab Building for repurpose as a training facility in accordance with drawings and specifications. Abatement of ACM and Lead existing in the building is included in this scope of work. 2. Structure Demolition of DHQ Dead House in accordance with drawings and specifications. Abatement of ACM and Lead existing in the building is included in this scope of work. 3. Civil site work in accordance with drawings and specifications at three locations on the DHQ campus. a. Civil work associated with Renovation of Old Lab Building b. Drainage Improvements to paved area in vicinity of Dead House c. Drainage Improvements to paved area accessing Shop loading bay. B. Perform Work of Contract under Lump Sum Total cost contract with Owner in accordance with Conditions of Contract. THIS PROJECT INCLUDES 1. COMPLETE DEMOLITION OF EXISTING DEAD HOUSE INCLUDING ASBESTOS & LEAD ABATEMENT, REMOVAL OF HMAC PAVEMENT AND REGRADING THE AREA SOUTH OF THE DEADHOUSE TO PROMOTE DRAINAGE AWAY FROM BUILDINGS AND REPAVE WITH CONCRETE. 2. REPAIR EXISTING SEWER LINE IN MAINTENANCE AREA, REMOVE HMAC PAVEMENT AND REGRADING TO PROMOTE DRAINAGE AWAY FROM SHOP BUILDING AND REPLACE PAVEMENT WITH CONCRETE. 3. COMPLETE INTERIOR BUILDING RENOVATION, ADDITIONAL STRUCTURAL STEEL TO PERMIT OPEN FLOOR PLAN, NEW CONSTRUCTED RESTROOMS, NEW ENTRY VESTIBULE, NEW REAR PATIO & NEW EXTERIOR FACADE. Written questions must be submitted no later than MARCH 7, 2023 Written questions must be sent to SSD_ContractLettings@txdot.gov

Details

5,500 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents