Similar Projects
Latino Cultural Center - AR00000005 - City of Phoenix
New Construction, Renovation, Infrastructure
Conception
$902,484 CJ est. value
Phoenix, AZ 85004

Airport T-Hangar Buildings - 103970 - City of Buckeye
New Construction, Infrastructure - 10,080 SF
Conception
$5,550,000 CJ est. value
Buckeye, AZ 85326

Fairfield Inn / Scottsdale
New Construction, Infrastructure - 75,622 SF
Design
$33,000,000 CJ est. value
Scottsdale, AZ 85255

Stream Data Center - Phoenix II-V/Phase 2-5
New Construction, Renovation, Infrastructure - 1,582,000 SF
Design
$150,000,000 CJ est. value
Goodyear, AZ 85338

Power Road Self Storage Facility / Mesa
New Construction, Infrastructure - 102,332 SF
Bidding
$10,500,000 CJ est. value
Mesa, AZ 85212

Lehi Loop Shared Use Pathway - Phase 1
Infrastructure
Post-Bid
$6,000,000 CJ est. value
Mesa, AZ 85208

Site 20 New Reservoir Construction - Town of Gilbert
Infrastructure
Post-Bid
$13,700,000 CJ est. value
Gilbert, AZ 85297

Construction Manager at Risk Booster Pump Station 83A/B Rehabilitation
Results
$8,500,000 to $1,500,000 est. value
Scottsdale, AZ 85258

Construction Manager at Risk Well Head Treatment Project-Well 7 Project
Alteration
Results
$7,000,000 est. value
Tempe, AZ

5290 East Exeter Subdivision
New Construction
Construction
Phoenix, AZ 85018

Bungalows on Westgate - Glendale
New Construction, Infrastructure
Construction
Glendale, AZ 85305

Laveen Spectrum
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Phoenix, AZ 85041

RFQ Design - Northeast Public Safety Facility
New Construction, Infrastructure
Pending Verification
$37,000,000 CJ est. value
Mesa, AZ 85207

Jomax Water Reclamation Facility Expansion - UT00388 - City of Peoria
Addition, Infrastructure
Conception
$65,499,546 CJ est. value
Peoria, AZ 85383

Central and Thomas High Rise
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Phoenix, AZ 85012

Last Updated 01/17/2023 09:50 AM
Project Title

RFP D/B - Zone 6E Reservoir and Booster Pump Station (Design Build)

Physical Address View project details and contacts
City, State (County) Peoria, AZ 85345   (Maricopa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dam/Tunnel, Lift and Pump Stations, Site Development
Contracting Method Design-Build Firm to Subcontract, Competitive Bids
Project Status Design Development, Construction start expected March 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $16,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

“The owner has selected a Design Builder. With the ongoing drought in the southwest region of the United States and Colorado River situation, the City of Peoria is anticipating significant reductions to the Central Arizona Project (CAP) water supplies in the near future. Peoria's water system, particularly north of Bell Road, is heavily dependent on receiving water from the CAP and any reductions could have significant impact on development in north Peoria. Peoria Water Services is actively working to establish water system redundancy for existing and future development utilizing groundwater wells in the event water is not available from the CAP system. Questions Due Date: Aug 16th 2022, 12:00 PM MST The committee is deciding whether to have the interviews in person or virtually. Those being interviewed will be made aware of the format in a timely manner. Sep 19th 2022, 8:00 AM MST - Sep 19th 2022, 12:00 PM MST

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents