Similar Projects
D/B Western MATOC
Design
$1,000,000 to $70,000,000 est. value

Pacific West Area Indefinite Quantity Contract for Construction Services
Design
$2,000 to $25,000,000 est. value

Defense Health Agency - Medical Facility Operations and Maintenance
Bidding
$2,500 to $90,000,000 est. value

New Washington County Administration Building
New Construction - 141,702 SF
Post-Bid
Less than $15,000,000 est. value
Saint George, UT

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Post-Bid
$3,000,000 to $15,000,000,000 est. value

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

UTTR Missile Motor Receipt & Storage Facility
New Construction - 7,000 SF
Results
$25,000,000 to $100,000,000 est. value
UT 84083

Access Control Point Program Design Build II -- RFI(2)
Design

Construction Inspection IDIQ
Post-Bid
$50,000 to $17,500,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

Z--Annex 1502000 Facility Investment Annex 1602000 Electrical
Post-Bid

Z--Simplified Acquisition of Basic Engineering Requirements (SABER)
Results
$10,000 to $40,000,000 est. value

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Post-Bid
Less than $150,000,000 est. value

Reported 05/23/2020 12:00 AM
Project Title

Tooele County Council Chamber Remodel

Physical Address View project details and contacts
City, State (County) Tooele, UT 84074   (Tooele County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will include the following: Removing the old windows, doors, carpet, elevated seating area and lighting. New HVAC ductwork will be installed, along with new lighting as shown on the plans. A new ceiling grid and elevated platform are to be constructed, as well as other aesthetic updates to the meeting room. 1. Demolition (remove existing walls, windows, seating area, closets, etc.) 2. Framing (new demising wall, doors, windows, elevated seating area, podium, etc.) 3. Electrical (New lights, cameras, TC's, speakers, etc.) 4. Mechanical (run new ductwork) 5. Finish Carpentry (install trim, countertop, etc.) 6. paint walls, install flooring & ceiling grid 7. Any other items necessary to complete the project

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents