Similar Projects
Last Updated | 06/26/2021 02:12 AM |
Project Title | Altoona Post Office Alley Repaving 2021 |
Physical Address | View project details and contacts |
City, State (County) | Altoona, IA (Polk County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $160,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project is located in the alley extending east off of 3rd Ave SE, between 8th St SE and 9th St SE in the City of Altoona, Iowa. The alley extends behind 3 businesses, including the Altoona USPS Office. The work includes removing the existing alleyway pavement, preparing the subgrade, adding a 3” rock base, repaving with 7” PCC pavement, and then adjusting affected fixtures to grade. The project intent is to reconstruct the alley pavement so that it drains to an intake installed by a previous project. The project includes 1410 SY of pavement removal and replacement with 7’ full-depth PCC, 1410 SY of subgrade preparation, 100 LF of removal and replacement of fencing, 100 LF of temporary fencing, 200 ton of 3” recycled concrete rock base, 1 sanitary manhole adjustment to grade with new casting, 1 SW-401 manhole adjustment to grade, 1 SW-501 adjustment to grade, 1 valve box adjustment, 3 curb stop adjustments to grade, seeding, traffic control, 50 LF of filter socks, steel matting, crack sealing, and a 2-year maintenance bond. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |