Similar Projects
Grade, Drain and Surface - SH 53A
Infrastructure
Design
$1,110,183 CJ est. value
Springer, OK 73458

Grade, Drain and Surface - SH 53A
Infrastructure
Design
$1,110,183 CJ est. value
Springer, OK 73458

Resurface (Asphalt) - SH-199
Infrastructure
Bidding
$5,808,466 CJ est. value
Ardmore, OK 73401

Resurface (Asphalt) - SH-199
Infrastructure
Bidding
$5,808,466 CJ est. value
Ardmore, OK 73401

Hangar Storm Sewer Improvements
Infrastructure
Post-Bid
$420,000 CJ est. value
Ardmore, OK 73401

Ardmore Downtown Executive Airport (ADEA) Hangar Infrastructure Project
Infrastructure, Renovation
Post-Bid
$640,000 CJ est. value
Ardmore, OK 73401

Slabjacking and Subsealing Services
Infrastructure
Results

Major Street Improvements
Infrastructure
Results
Ardmore, OK

Bridge and Approaches - SH 199
Infrastructure
Design
$2,300,000 CJ est. value
Ardmore, OK 73401

Columbarium and All Appurtenances Thereto
Infrastructure
Bidding
$200,000 CJ est. value
Ardmore, OK 73401

Construction of Carter County Maintenance Building
New Construction, Infrastructure
Post-Bid
$79,799 CJ est. value
Ardmore, OK 73401

Grade, Drain, Surface, and Bridge SH-53: From 6.4 Miles West of the I-35 Junction, Extend East Near Springer. Project Length 6.029 Miles
New Construction, Infrastructure
Results
OK

Utilities - US 70
Infrastructure
Design
$1,599,500 CJ est. value
Lone Grove, OK 73443

Resurface (Asphalt) - SH-76
Infrastructure
Bidding
$577,775 CJ est. value
Healdton, OK 73438

Albertsons #0031 / Ardmore
New Construction, Infrastructure - 50,630 SF
Post-Bid
$20,000,000 CJ est. value
Ardmore, OK 73401

Last Updated 03/06/2023 07:07 AM
Project Title

Bridge and Approaches - US 77

Physical Address View project details and contacts
City, State (County) Ardmore, OK 73401   (Carter County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value $1,247,400 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Us 77: Over Unnamed Creek 0.5 Mis. N. Of the Love C/l As of March 06, 2023, the project is in Design status. Anticipated letting month/year is November, 2023. Length : 0.200 Mi. OKDOT - Bridge and Approaches - US 77 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents