Similar Projects
Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Bridge and Approaches - US 77
Infrastructure
Design
$1,247,400 CJ est. value
Ardmore, OK 73401

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Hangar Storm Sewer Improvements
Infrastructure
Post-Bid
$420,000 CJ est. value
Ardmore, OK 73401

Slabjacking and Subsealing Services
Infrastructure
Results

Major Street Improvements
Infrastructure
Results
Ardmore, OK

Bridge and Approaches - SH 199
Infrastructure
Design
$2,300,000 CJ est. value
Ardmore, OK 73401

Resurface (Asphalt) - SH-199
Infrastructure
Bidding
$5,808,466 CJ est. value
Ardmore, OK 73401

Ardmore Downtown Executive Airport (ADEA) Hangar Infrastructure Project
Infrastructure, Renovation
Post-Bid
$640,000 CJ est. value
Ardmore, OK 73401

Grade, Drain, Surface, and Bridge SH-53: From 6.4 Miles West of the I-35 Junction, Extend East Near Springer. Project Length 6.029 Miles
New Construction, Infrastructure
Results
OK

Utilities - US 70
Infrastructure
Design
$1,599,500 CJ est. value
Lone Grove, OK 73443

Construction of Carter County Maintenance Building
New Construction, Infrastructure
Bidding
$79,799 CJ est. value
Ardmore, OK 73401

Albertsons #0031 / Ardmore
New Construction, Infrastructure - 50,630 SF
Post-Bid
$20,000,000 CJ est. value
Ardmore, OK 73401

Last Updated 02/24/2023 03:12 AM
Project Title

Grade, Drain and Surface - SH 53A

Physical Address View project details and contacts
City, State (County) Springer, OK 73458   (Carter County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value $1,110,183 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sh 53a: Over Big Branch Creek O'flow 0.11 Mis. S. Of Sh 53 As of February 24, 2023, the project is in Design status. Anticipated letting month/year is November, 2023. Length : 0.200 Mi. OKDOT - Grade, Drain and Surface - SH 53A *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents