Similar Projects
Northeast HS SMART Program
Renovation, Addition
Conception
$17,840,962 est. value
Fort Lauderdale, FL 33334

McArthur HS SMART Program
Conception
$7,488,655 est. value
Hollywood, FL 33024

Historic Miramar Innovation and Technology Village
Design
Miramar, FL 33025

Academic Solutions Academy Charter High School
Renovation, Addition - 22,830 SF
Design
Coral Springs, FL 33065

Whiddon-Rogers Educational Center- Smart Program Renovations
Renovation
Bidding
$3,567,323 est. value
Fort Lauderdale, FL 33315

Continuing Contracts Construction Management at Risk Services
Renovation, Term Contract
Bidding
$1,000,000 to $2,000,000 est. value
FL

Aquatics Facility Renovations - Deerfield Beach Middle School
Renovation, Infrastructure
Post-Bid
$1,425,000 est. value
Deerfield Beach, FL 33441

Whispering Pines Education Center - Smart Program Renovations
Renovation
Post-Bid
$1,410,526 est. value
Miramar, FL 33025

Wingate Oaks Center - Smart Program Renovations
Renovation
Results
Less than $1,706,457 est. value
Fort Lauderdale, FL 33311

South Broward High School - Smart Program Renovations
Results
$10,765,100 est. value
Hollywood, FL 33020

Alazhar School
Addition - 19,785 SF
Construction
$1,711,950 est. value
Tamarac, FL 33068

Piper High School - Smart Program Renovations
Renovation, Term Contract
Construction
Sunrise, FL 33351

Cooper City High School STEM Lab Improvements
Renovation
Design
$8,459,000 est. value
Fort Lauderdale, FL 33328

Continuing Contracts Construction Management at Risk Services
Renovation, Term Contract
Bidding
$28,000,000 est. value
FL

Coral Springs High School-Smart Program Renovations
Renovation
Results
Less than $7,512,532 est. value
Coral Springs, FL 33065

Last Updated 11/16/2021 07:16 AM
Project Title

Lauderhill Community School at Park Lakes Learning CTR - Smart Program Renovations

Physical Address View project details and contacts
City, State (County) Lauderhill, FL 33313   (Broward County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $425,613
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work of this Contract comprises the general construction of: Building 1: 1. Fire Alarm Replacement In Entire Facility With New. Replace All Existing Fire Alarm Devices And Associated Equipment With New. This Will Include, But Not Limited to Initiating Devices, Notification Appliances, Smoke/Heat Detectors, Duct Detectors, Wiring, Conduit, Boxes And Devices for Complete Working Systems, As Well As Any Electrical Demolition Necessary. Contractor Shall Notify Project Consultant Should Circuiting Vary From Information Shown. 2. Entire Exterior to Receive New Painting. Top Side of Concrete Eyebrows (Painted: Pressure Wash and Prepare to Receive New Waterproofing Coating. Refer to Specifications 07 14 13 Hot Fluid Applied Waterproofing (As Part of Painting Scope) 3. Exterior Doors, Frames & Hardware Replacement. See Schedule Sheet a-600 (Note: Pm Has Removed Windows From Scope) 4. HVAC Roof Mounted Ductwork Requires Replacement. Refer to Mechanical Plans for More Detail 5. HVAC Duct Heater Replacement: Provide New Duct Heaters In Existing Ahu. Refer to Mechanical Plans for More Detail 6. Media Center Renovation Consisting of Carpet Replacement, Installing New Baseboard, Painting Perimeter Walls, Doors, As Well As the Interior Face of Window And Door Frames. a Laptop Cart And 2 Additional Desktops Are Also to Be Added. See Room 106 On Sheet a-111-b1 Alternate 1: Fire Alarm Panel Training: 7. Provide Fire Alarm Panel Training By the Manufacturer for Certification of Ppo (9 People) Software Key Turn-Over

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents