Similar Projects
Boyd H Anderson High School SMART Program
Renovation
Conception
$5,274,000 est. value
Fort Lauderdale, FL 33309

Cooper City HS SMART Program
Renovation
Conception
$6,413,081 est. value
Fort Lauderdale, FL 33328

School Board of Broward County’s Perry Middle School Property
Design
Miramar, FL 33025

Academic Solutions Academy Charter High School
Renovation, Addition - 22,830 SF
Design
Coral Springs, FL 33065

Construction Management at Risk Services Northeast High School New Addition and Renovation to Building 12
Renovation, Addition
Post-Bid
Oakland Park, FL 33334

William East Dandy Middle School-Smart Program Renovations
Renovation
Post-Bid
Less than $2,101,196 est. value
Fort Lauderdale, FL 33311

Sunrise Middle School - SMART Program Renovations
Renovation
Results
Less than $1,805,189 est. value
Fort Lauderdale, FL

Everglades High School - Smart Program Renovations
Renovation
Results
Less than $2,474,489 est. value
Miramar, FL 33027

Alazhar School
Addition - 19,785 SF
Construction
$1,711,950 est. value
Tamarac, FL 33068

Piper High School - Smart Program Renovations
Renovation, Term Contract
Construction
Sunrise, FL 33351

Deerfield Beach HS SMART Program
Conception
$2,902,214 est. value
Deerfield Beach, FL 33441

Mesivta of Coral Springs
Renovation - 40,712 SF
Design
Coral Springs, FL 33065

J. P. Taravella High School Smart Program Renovations Project
Renovation
Post-Bid
Coral Springs, FL 33313

New River Middle School - Smart Program Renovations
Renovation
Results
Fort Lauderdale, FL 33024

Driftwood Middle School - Smart Program Renovations
Renovation
Construction
Less than $3,713,337 est. value
Hollywood, FL 33024

Last Updated 01/21/2021 12:53 AM
Project Title

Wingate Oaks Center - Smart Program Renovations

Physical Address View project details and contacts
City, State (County) Fort Lauderdale, FL 33311   (Broward County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,706,457
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SITE IMPROVEMENTS Complete installation of new fire alarm and removal of existing fire alarm system throughout campus. Existing fire alarm system to remain intact and functional until new system is fully operational and certified. New fire alarm system to be installed as per FFPC 2014. All new conduit and infrastructure to be concealed (surface mounted conduit and infrastructure will not be allowed). Contractor to repair, patch and paint all work related to F.A. installation and is to carry the repair, patch & paint to next adjacent vertical and/or horizontal break in the walls on either side and above and below works area. BUILDING # 1: • Re-roofing with new decking required** (Broward CPS) • Complete kitchen HVAC installation for non-a/c facility • Package roof top unit requires replacement • The chiller HVAC component is damaged requires replace • The exterior chiller HVAC requires replacement • Package roof top unit requires replacement • The air handler HVAC component requires replacement • The fan coil (chilled water) HVAC component requires replacement • The package unit HVAC component requires replacement • Duct cleaning required media center requires renovation provide renovation of RR associated with ed. adequacy renovation. BUILDING # 2 • Re-roofing with new decking required** (Broward CPS) • The exterior condenser requires replacement • The chiller HVAC component is damaged requires replace • The exterior chiller requires replacement BUILDING # 3 • Re-roofing BUILDING # 4 • Re-roofing with new decking required** (Broward CPS) • The exterior air handler HVAC component requires replacement • Ductwork requires replacement (sf basis) • The air handler HVAC component requires replacement BUILDING # 5 • Re-roofing with new decking required** (Broward CPS) • The fan coil HVAC component requires replacement

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents