Similar Projects
Bill Baggs Cape Florida State Park – ADA Sidewalk Renovations
Bidding
Key Biscayne, FL 33149

Harvest Center Sidewalk Improvements
Post-Bid
Homestead, FL

VCA Improvements to Common Areas & Parking Spaces
Post-Bid
Hialeah, FL 33014

Parking Lot Resealing at Trails and Tails Park and Veterans Park
Results
Less than $22,000 est. value
Doral, FL 33178

Pinecrest Gardens Parking Lot Resurfacing
Results
Less than $425,000 est. value
Pinecrest, FL 33156

Re-Pave / Repair / Re-Stripe Parking Lot - MIAMI FL
Post-Bid
Miami, FL 33158

North Miami Beach Northeast 13th Avenue Traffic Calming
Results
North Miami Beach, FL 33162

Pinecrest Gardens Lower Gardens ADA Complaint Pathway Construction
Post-Bid
Miami, FL 33156

ADA Sidewalk Improvements
Results
Less than $457,500 est. value
Miami, FL 33128

Safe Route to Schools Locations Phase 22 FM 439895-1
Post-Bid
Less than $171,530 est. value
Hialeah, Miami Gardens, Opa-locka, FL 33014

Sidewalk Improvements - Multiple Sites
Results
Less than $321,370 est. value
Kendall, FL 33193

Safe Route to Schools Locations Phase 21 FM 439894-1
Post-Bid
Less than $382,771 est. value
Miami, FL 33144

Affordable Housing - 1650,1655,1675, and 1680 West 56th Street Accessible (ADA) Parking Spaces Improvements
Results
Hialeah, FL 33012

Suniland Park ADA Sidewalk Improvements
Post-Bid
Pinecrest, FL 33156

Bike/Pedestrian Facilities Improvements
Results
Miami, FL 33189

Last Updated 06/29/2020 08:51 AM
Project Title

Sidewalk Improvements - Multiple Sites

Physical Address View project details and contacts
City, State (County) Miami, FL 33128   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $960,909
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work under this Contract includes furnishing of all supervision, labor, materials, tools, equipment and performing all operations required to construct the Work in accordance with the Contract Documents. Work includes construction of new sidewalks, sidewalk connectors, driveway approaches, curb ramps, curbs and/or gutters; reconstruction and/or repair of existing sidewalks, sidewalk connectors, driveway approaches, curb ramps, curbs and/or gutters; removal and disposal of various existing pavements, trees, tree roots and debris; grading and preparation of subgrade and sodding; and adjustment of existing utility valve covers to new finished grade. One or a combination of more than one of the work described herein may be required to be performed at any given site pursuant to the requirements of the Work Order governing the site. 1. SW 68 Ave from end of sidewalk on the west side to the NW corner of SW 53 St 2. The Crossings (SW 104 St to SW 112 St from SW 136 Ct to SW 132 Ct and SW 104 St to SW 108 St from SW 130 Ave to SW 128 Ave) 3. SW 2 Street from SW 118 to SW 122 Avenue (New Sidewalks on South Side from SW 118 Avenue to SW 120 Avenue, repairs along south side from SW 120 Avenue to SW 122 Avenue and repairs along the entire North side) 4. NW 199 St to NW 194 St from NW 57 Pl to NW 62 Ave & NW 199 St to NW 188 Ter from NW 62 Ave to NW 67 Ave

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents