Similar Projects
Baby Grande
New Construction, Build-Out - 25,001 SF
Conception
Destin, FL

West Port
New Construction - 200,000 SF
Conception
$10,000,000 CJ est. value
Port Charlotte, FL

Peninsula Bay - Master Plan
New Construction
Design
Cortez, FL 34210

Solis Orlando Resort, Capella Suites Hotel and Retail Complex
New Construction - 1,600,000 SF
Design
$500,000,000 est. value
Orlando, FL 32819

Hyatt House at Orlando Gateway
New Construction - 122,357 SF
Sub-Bidding
$23,000,000 est. value
Orlando, FL 32812

Holiday Inn Express
New Construction, Demolition - 96,843 SF
Sub-Bidding
$9,750,000 est. value
Hollywood, FL 33020

Tribute by Marriott
New Construction
Post-Bid
$12,000,000 est. value
Saint Augustine, FL 32080

Holiday Inn Express
New Construction
Post-Bid
$5,656,920 est. value
Starke, FL

Y--Design-Build (DB) Construction Project P741 Navy Gateway Inn and Suites (NGIS), NAS Key West, FL
New Construction - 171,199 SF
Results
$25,000,000 to $100,000,000 est. value
Key West, FL

County-Owned Property Redevelopment
Results
Altamonte Springs, FL 32701

The Plaza Coral Gables
New Construction - 2,120,000 SF
Construction
$100,000,000 est. value
Coral Gables, FL 33134

Santa Barbara Hotel
Renovation, Addition - 21,250 SF
Construction
$8,000,000 est. value
Miami Beach, FL 33109

Mixed-Use Tower
New Construction
Pending Verification
Orlando, FL 32801

Miramar Beach Resort
New Construction - 47,170 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Saint Pete Beach, FL 33706

Marriott Element
New Construction
Conception
$50,000,000 est. value
Hollywood, FL 33004

Last Updated 03/23/2021 11:54 AM
Project Title

Hampton Inn & Suites

Physical Address View project details and contacts
City, State (County) Callaway, FL 32404   (Bay County)
Category(s) Commercial
Sub-Category(s) Hotel/Motel
Contracting Method Qualified Bidding.
Project Status All Bids Received, Selection Underway
Bids Due View project details and contacts
Estimated Value
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Hotel/Motel, 3 Stories Above Grade, 40,292 SF New Construction 68 Unit(s), 3 Acres.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 13 - Special Construction, Swimming Pools.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents