Similar Projects
Michael Etchison Connector - City of Monroe
Infrastructure
Conception
$1,200,000 CJ est. value
Monroe, GA 30655

Alcovy River Gravity Sewer - City of Monroe
Infrastructure
Conception
$4,000,000 CJ est. value
Monroe, GA 30655

Grove at Rosebud - Phase 2
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Loganville, GA 30052

Jacks Creek Landing
New Construction, Infrastructure
Design
$105,000,000 CJ est. value
Monroe, GA 30655

Sewer Improvements FY2022
Infrastructure
Bidding
$700,000 CJ est. value
Monroe, GA 30655

Sewer Improvements FY2022
Infrastructure
Bidding
$700,000 CJ est. value
Monroe, GA 30655

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Rivian Phase I Grading
Infrastructure
Post-Bid
$100,000 CJ est. value
Monroe, GA 30655

North Loop Water Transmission Main
Infrastructure
Results
GA

2021 LMIG Paving Project
Infrastructure
Results
$378,334 CJ est. value
Loganville, GA 30052

Phase I Grading - Rivian Automotive East Atlanta Megasite / Stanton Springs North
New Construction, Infrastructure
Construction
$100,000,000 CJ est. value
Social Circle, GA 30025

Brand Road C-Store / Loganville
New Construction, Infrastructure - 3,237 SF
Construction
$2,227,627 CJ est. value
Loganville, GA 30052

Lake Carlton Road Townhomes
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Loganville, GA 30052

Twin Forks
New Construction, Infrastructure
Pending Verification
$22,500,000 CJ est. value
Loganville, GA 30052

South Cherokee to Spring Street Tank 12" Water Main Replacement - City of Social Circle
Infrastructure
Conception
$420,000 CJ est. value
Social Circle, GA 30025

Last Updated 10/06/2023 10:47 AM
Project Title

Natural Gas Main Relocation - Bypass

Physical Address View project details and contacts
City, State (County) Monroe, GA 30655   (Walton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate - 09/04/23
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Monroe will be accepting Bids to contract services for the installation and relocation of natural gas mains for the proposed SR 83 Connector bypass project. All submittals should follow instructions as detailed in the Invitation to Bid and be complete in scope as requested by the City of Monroe. Bids will be reviewed and evaluated by staff on the criteria listed herein. At the discretion of the Purchasing Department companies may or may not be contacted for further justification on pricing and details provided in the Bid submittal. Award shall be given to the lowest bid that meets the requirements as listed in this Invitation to Bid, while being both responsive and responsible, with reservation of right to reject any and all bids. We thank you in advance for your submission and welcome any questions you may have during the process. Chris Bailey Assistant City Administrator SCOPE OF SERVICES REQUESTED The following details the scope of services requested for the installation/relocation of steel natural gas main located on Highway 11 South in the area of Mt. Paran Church Road by directional bore or trench cutting. o 600 feet of 2" steel high pressure gas main. o 2,750 feet of 4" steel high pressure gas main. o Pressure test at 300 psi for a period of no less than 24 hours and provide chart recording verifying pressure test completion. o Tie-in of all 3/4 " steel high pressure gas line services to include 5 long side services and 3 short side services. o 2" main tie-ins at existing station 314+25, contractor responsible for control fittings and taps associated. o 4" main tie-ins at existing station 293+60 and existing station 266+50, contractor responsible for control fittings and taps associated. o NOTE: all material will be provided by the City of Monroe. o NOTE: the City of Monroe will relight all gas services upon completion. o NOTE: existing gas main pressure is 150 psi. o NOTE: no bid, performance, or payment bonds required. o NOTE: timeline for completion is not to exceed 60 days. Question Deadline 09/25/2023 at 5:00 PM ET

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents