Similar Projects
Rivian Automotive East Atlanta Megasite Building Vertical Construction / Stanton Springs North
New Construction, Infrastructure - 12,000,000 SF
Conception
$5,000,000,000 CJ est. value
Social Circle, GA 30025

Rivian Automotive East Atlanta Megasite Building Vertical Construction / Stanton Springs North
New Construction, Infrastructure - 12,000,000 SF
Conception
$5,000,000,000 CJ est. value
Social Circle, GA 30025

SR 138 at SR 10 / US 78
Infrastructure
Design
$2,000,000 CJ est. value
Walnut Grove, GA 30052

RFQ - Blaine Station Development
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Monroe, GA 30655

Planet Fitness Sitework / Loganville
Infrastructure
Bidding
$1,000,000 CJ est. value
Loganville, GA 30052

Top Polymer Enterprises
New Construction - 60,000 SF
Post-Bid
$15,000,000 est. value
Social Circle, GA 30025

Piedmont Regional Industrial Park Site Grading
Infrastructure
Post-Bid
GA

Loganville Dental Office
New Construction, Infrastructure - 4,200 SF
Pending Verification
$900,000 CJ est. value
Loganville, GA 30052

Newbury Place Phase 2
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Loganville, GA 30052

Lake Carlton Townhomes
New Construction, Infrastructure
Conception
$35,000,000 CJ est. value
Loganville, GA 30052

Rivian Phase I Grading
Infrastructure
Post-Bid
$100,000 CJ est. value
Monroe, GA 30655

Ozora Road Residential Subdivision
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Loganville, GA 30052

Ozora Heights Amenity
New Construction, Infrastructure
Conception
$9,000,000 CJ est. value
Loganville, GA 30052

Monroe Dental Monroe GA
New Construction, Infrastructure - 4,336 SF
Post-Bid
$1,200,000 CJ est. value
Monroe, GA 30656

Ozora Church Road Subdivision
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Loganville, GA 30052

Last Updated 09/13/2022 10:14 AM
Project Title

RFP Phase I Grading - Rivian Automotive East Atlanta Megasite / Stanton Springs North

Physical Address View project details and contacts
City, State (County) Social Circle, GA 30025   (Walton County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected September 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $100,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 12, 2022 a site contractor has been awarded. Site work is expected to start October 2022. Vertical construction is expected to start fourth quarter 2023. __________________ The scope of work includes the construction of a new electric vehicle factory located on the North side of Interstate 20 between Highway 278, Darell Drive, and Old Mill Road, in Walton County, Morgan County, and the City of Social Circle, GA Rough Grading Phase 1A & 1B of Stanton Springs North (Rivian) Pre-Proposal Conference: A Mandatory Pre-Proposal Conference will be held at 2:00 PM, June 23, 2022, at the Georgia BioScience Training Center located at 320 Shire Parkway, Social Circle, Georgia 30025. Failure to participate may, at the discretion of the Owner, be cause for rejection of the proposal The Joint development Authority and physically received by it at the Newton County Industrial Development Authority offices located at 2105 Lee Street SW, Covington, Georgia, USA 30014, no later than 2:00 p.m. on July 11, 2022 Description of Requested Services: Preparation of an approximately 500-acre pad, including but not limited to clearing, grubbing, grading, and limited storm drainage. Plans and Specifications for the Project are open to inspection at the offices of the Newton County Industrial Development Authority, 2105 Lee Street SW, Covington, Georgia, USA 30014, at the offices of Development Authority of Walton County, 132 East Spring Street, Monroe, Georgia, USA 30655, and at the offices of the Morgan County Chamber of Commerce /Economic Development Office, ATTN: Bob Hughes, 118 North Main Street, Madison, GA 30650 Documents & Plans will be available via hard copy upon payment of $100.00 (plus shipping charges as applicable). Payment must be received before plans are printed. This payment is nonrefundable. Electronic documents will be available as well. Offerors may email Jason Chambless at chambless.j@tandh.com to request electronic copies of documents. Scope of Work: The work to be awarded includes construction of the Project as described in the RFP and the Plans and Specifications. Pre-Proposal Conference: A Mandatory Pre-Proposal Conference will be held at 2:00 PM, June 23, 2022, at the Georgia BioScience Training Center located at 320 Shire Parkway, Social Circle, Georgia 30025. Failure to participate may, at the discretion of the Owner, be cause for rejection of the proposal. Basis for Award: The Owner will evaluate proposals from "responsive" and "responsible" offerors (as defined by the Act) using certain evaluation factors designed to identify the most advantageous proposal as determined by the Owner, all as more particularly described in the RFP. Proposal Process: Proposals must be in a sealed envelope addressed to The Joint Development Authority and physically received by it at the Newton County Industrial Development Authority offices located at 2105 Lee Street SW, Covington, Georgia, USA 30014, no later than 2:00 p.m. on July 11, 2022, at which time the proposals submitted shall be privately opened. The Proposal shall be marked with the project title, and name and address of Offeror, and accompanied by the Proposal security and other required documents. All proposals shall be submitted on forms provided by the Owner or as otherwise indicated in the RFP and shall be evaluated and otherwise governed by the terms and provisions contained in the RFP. Copies of such documents are available upon request from the Owner. When obtaining the RFP, the offeror must provide its name, address, and email address to which any Addenda to the RFP can be sent. Offerors will be required to honor their proposals for a period ending 60 days after the Owner opens the proposals; provided, however, that if an offeror is not selected within 60 days of opening the proposals, any offeror that is determined by the Owner to be unlikely of being selected for Contract award shall be released from its proposal. However, it is expected that an award will be made no later than sixty (60) days following opening of the sealed proposals unless the Owner elects to reject all proposals Proposal Bond: Each offeror must include with its proposal a proposal bond complying with the Act, in form prescribed by the RFP, in an amount equal to at least ten (10%) percent of the total contract price indicated in the proposal to be submitted. The proposal bond must be issued by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability." In lieu of the aforesaid proposal bond, the Owner will accept a cashier's check, certified check or cash in said amount, payable to and for the protection of the Owner. Any proposal submitted without said proposal bond or an approved alternate security shall be ineligible for consideration and shall be returned to offeror. Modification: Subject to O.C.G.A. 36-91-20(d) and other provisions of the Act, the Authority reserves the right to issue addenda to and otherwise modify the RFP at such time(s) and in such manner as it deems appropriate

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents