Similar Projects
Rivian Automotive East Atlanta Megasite Building Vertical Construction / Stanton Springs North
New Construction, Infrastructure - 12,000,000 SF
Conception
$5,000,000,000 CJ est. value
Social Circle, GA 30025

Spring Street Tank 10" Water Main Loop (Tank to CSX Bore on E Hightower) - City of Social Circle
Infrastructure
Conception
$350,000 CJ est. value
Social Circle, GA 30025

Treweeke Self-Storage
New Construction, Demolition, Infrastructure - 68,250 SF
Design
$10,000,000 est. value
Monroe, GA 30656

Brand Road Convenience Store and Gas Station
New Construction, Infrastructure - 3,237 SF
Design
$1,000,000 CJ est. value
Loganville, GA 30052

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Piedmont Regional Industrial Park Site Grading
Infrastructure
Post-Bid
GA

Water System Project
Infrastructure
Post-Bid
GA

2021 Milling and Deep Patching
Results
Monroe, GA

FY 2020 CDBG Storm Drainage and Street Improvements
Infrastructure
Results
Monroe, GA

Lake Carlton Road Townhomes
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Loganville, GA 30052

Lake Carlton Road Townhomes
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Loganville, GA 30052

North Cherokee 12" Water Main Replacement (Ronthor to RR) - City of Social Circle
Infrastructure
Conception
$538,180 CJ est. value
Social Circle, GA 30025

Grove at Rosebud - Phase 2
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Loganville, GA 30052

Lake Carlton Water Main Improvements
Infrastructure
Bidding
$900,000 CJ est. value
Loganville, GA 30052

Last Updated 12/06/2022 04:45 PM
Project Title

Destination Park Sidewalk, Utility, and Site Improvements - Phase 1

Physical Address View project details and contacts
City, State (County) Loganville, GA 30052   (Walton County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Misc. Recreational, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,199,999 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of constructing new sidewalk along Old Loganville Road and Tuck Rd along with stormwater, water, and sewer force main, as well as landscaping and a restroom building in Destination Park. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis. Bid security shall be furnished in accordance with the Instructions to Bidders. Bid security shall be submitted with each bid in the amount of 5 percent of the total bid amount. No bid may be withdrawn for a period of 60 calendar days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities. No proposal will be considered unless it is accompanied by satisfactory evidence that the Bidder holds either a Georgia State Contractor's License, Georgia State Utility Contractor's License, or qualifications with the Georgia Department of Transportation for similar work, in compliance with Act. O.C.G.A. 43-14 and 43-41. Failure to provide the bidder's license or qualification number on the outside of the sealed proposal will result in rejection of the bid. All required federal, state, and local permits as well as required easements or rights of way for the project have been obtained. If the Contract is to be awarded, Owner will award the Contract on the basis of the base bid. Successful bidder shall begin the Work on receipt of the Notice to Proceed and shall complete the Work within the Contract Time of 240 calendar days. Owner shall make progress payments on account of the Contract Price on the basis of Contractor's Applications for Payment submitted once per month as provided in the General Conditions.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents