Similar Projects
Windermere Ward Trail - Town of Windermere
Infrastructure
Conception
Less than $2,590,000 est. value
Windermere, FL

Lake Underhill Road Widening Segment 2 - Orange County
Infrastructure
Conception
$5,000,000 est. value
Orlando, FL 32885

Cold In-Place Bituminous Base Recycling with Asphalt Resurfacing
Term Contract
Bidding
$13,057,755 est. value
Orlando, FL

Asphalt Milling and Resurfacing with Friction Course and Asphalt Berms
Infrastructure
Bidding
$63,598,027 est. value
Orlando, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Concrete and Asphalt Restoration Services
Infrastructure
Post-Bid
Orlando, FL

SR 417 Widening from John Young Parkway to Landstar Boulevard
Results
Less than $116,845,417 est. value
Orlando, FL 32824

University Boulevard at Rouse Road Intersection Improvements
Results
$1,381,618 est. value
Orlando, FL 32800

Buena Vista Drive North - Median Closure
Construction
Orlando, FL 32800

SheltAir FBO Parking Lot Expansion
Addition
Construction
Orlando, FL 32803

Hot In-Place Asphalt Recycling
Infrastructure
Post-Bid
$3,000,000 est. value
Orlando, FL

Asphalt Repair
Results
Less than $750,000 est. value
FL

South Starr Street Improvements
Infrastructure
Post-Bid
Oakland, FL 34760

Shoulder and Utility Strip Rework
Results
Less than $89,000,000 est. value

LSG Sky Chefs Parking Lot
Infrastructure
Post-Bid
Orlando, FL 32827

Reported 06/16/2022 07:16 AM
Project Title

Lake Underhill Road Widening Segment 3 - Orange County

Physical Address View project details and contacts
City, State (County) Orlando, FL 32885   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2024
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Orlando, Florida. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. Lake Underhill Road from Goldenrod Road to Rouse Road will be widened from two to four lanes, and will include bike lanes, sidewalks, roadway lighting, and median landscaping. Segment 3 includes Chickasaw Trail to Econlockhatchee Trail. As of June 15, 2022, this project is in the conceptual phase. Information regarding a design team and the contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents