Similar Projects
Last Updated | 05/12/2023 04:31 AM |
Project Title | Add Lanes and Reconstruct/Milling and Resurfacing/Base Work/Drainage Improvements |
Physical Address | View project details and contacts |
City, State (County) | Jacksonville, FL 32211 (Duval County) |
Category(s) | Heavy and Highway, Outdoor Lighting, Sewer and Water |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected May 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $19,358,596 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Counties: Duval Road Name: Sr 9a (I-295) Limits: From Sr 212 (Beach Blvd) to Sr 202 (Jt Butler Blvd) Project(s): 20930185201(*) Federal Aid No: N/A Total Roadway Length: 1.291 Miles Contract Days: 300 Total Bridge Length: 0.433 Miles Total Proposal Length: 1.724 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Days The improvements under this contract consist of milling and resurfacing, base work, asphalt widening and new shoulder construction, curb and gutters, drainage improvements, guardrail, highway signing, lighting, intelligent transportation systems, and other incidental construction on I-295 (SR 9A) in Duval County from SR 212 (Beach Boulevard) to SR 202 (J. T. Butler Boulevard). This contract is being funded by the American Rescue Plan Act (ARPA). For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 001 Add Lanes and Reconstruct/Milling and Resurfacing/Base Work/Drainage Improvements |
||||||||||||||||||||||
Details |
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |