Similar Projects
Last Updated | 12/20/2021 01:56 PM |
Project Title | Loch Fyne 20” Gas Pipeline, Phase 1 Design |
Physical Address | View project details and contacts |
City, State (County) | CO (El Paso County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Colorado Springs Utilities (Utilities) is seeking a competent and knowledgeable Contractor with demonstrable expertise in pipeline design. The Contractor shall provide final engineering and a set of drawings for the installment of a 20” pipeline to replace existing 12” and 16” gas pipeline, per Colorado Springs Utilities Standards. The Contractor shall include all pertinent information in the extent of the project, including all utilities via Subsurface Utility Engineering (SUE), crossings, and easements (if applicable). The design drawings shall include information regarding grading, pressure testing, and a materials list. The engineering shall factor in roadways, crossings, vehicular traffic, pedestrian traffic, and peak times of use for design and installation for the schedule. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |