Similar Projects
Lido Key Hurricane Storm Damage Reduction Project Sarasota County, Florida
Post-Bid
$20,000,000 to $30,000,000 est. value
Sarasota, FL 34230

Lido Key Hurricane Storm Damage Reduction Project Sarasota County, Florida
Post-Bid
$20,000,000 to $30,000,000 est. value
Sarasota, FL 34230

CBJTC Precinct Road North Culvert Replacement
Results
Less than $500,000 est. value
Starke, FL 32091

CBJTC North Tank Trail Emergency Repair
Results
Less than $350,000 est. value
Starke, FL

Canal Maintenance Services
Term Contract
Post-Bid
Miami, FL 33128

CBJTC East Bay Road Washout Repair
Results
Less than $500,000 est. value
Starke, FL 32091

Washington County Concrete Drainage Features
Post-Bid
Chipley, FL 32428

CBJTC Gulfport Street Washout Repair
Results
Less than $420,000 est. value
Starke, FL 32091

Construction Services for Poitras East Community Development District
Post-Bid
FL

CBJTC Mosley Road Washout Repair
Results
Less than $500,000 est. value
Starke, FL 32091

Kaicasa - Concrete Box Culvert
Post-Bid
Immokalee, FL

CBJTC Prison Camp Road Washout Repair
Results
Less than $300,000 est. value
Starke, FL 32091

10/1366DN EGLIN NON-POINT SOURCE PROJECT OKALOOSA / W
Post-Bid
Eglin AFB, FL

Seawall Repair
Results
Everglades, FL

Sweetwater Drainage Improvements: Phase 8A
Post-Bid
Sweetwater, FL 33174

Last Updated 05/12/2020 02:17 PM
Project Title

Thomas P. Smith W.R.F. Effluent Storage Pond #6 Reconstruction Linner Replacement

Physical Address View project details and contacts
City, State (County) Tallahassee, FL   (Leon County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $998,928
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this project consists of furnishing all labor, equipment and materials for the demolition of out of service piping and vaults and substantial earthwork to allow for the construction of an improved effluent storage pond. Including installation of new 24" influent piping and valves, 36 mil reinforced polypropylene liner, roadway and other related items.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents