Similar Projects
La Joya ISD Esser Funds - Canopy Structures Phase 3
Infrastructure
Design
$98,000 CJ est. value
La Joya, TX 78560

Just A Closet #7 / Pharr
New Construction, Infrastructure - 69,175 SF
Design
$2,000,000 CJ est. value
Pharr, TX 78577

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2020 Donna Street Improvement
Infrastructure
Post-Bid
Donna, TX 78537

Street Material
Results
Weslaco, TX 78599

San Juan Street Improvements
Results
$230,577 est. value
Pharr, TX 78577

Habitat At Grove Apartments
New Construction, Infrastructure - 130,000 SF
Construction
$14,000,000 CJ est. value
McAllen, TX 78501

Habitat At Grove Apartments
New Construction, Infrastructure - 130,000 SF
Construction
$14,000,000 CJ est. value
McAllen, TX 78501

Quick Quack Car Wash / Donna
New Construction, Infrastructure - 4,189 SF
Pending Verification
$500,000 CJ est. value
Donna, TX 78537

Quick Quack Car Wash / Donna
New Construction, Infrastructure - 4,189 SF
Pending Verification
$500,000 CJ est. value
Donna, TX 78537

Super Starr Produce Warehouse
New Construction, Infrastructure - 67,514 SF
Design
$9,000,000 CJ est. value
San Juan, TX 78589

Taco Bell / Mission
New Construction, Infrastructure - 2,400 SF
Post-Bid
$750,000 CJ est. value
Mission, TX 78572

Edcouch Street Improvements Project
Results
$235,700 est. value
TX

Tony's Playhouse
New Construction, Infrastructure - 1,800 SF
Construction
$100,000 CJ est. value
McAllen, TX 78501

7 Eleven / McAllen
New Construction, Infrastructure - 4,754 SF
Pending Verification
$1,640,000 CJ est. value
McAllen, TX 78501

Last Updated 11/16/2022 10:34 PM
Project Title

RFP Engineering - Hidalgo County Regional Mobility Authority 365 Toll Collection System Installation, Integration, and Maintenance

Physical Address View project details and contacts
City, State (County) Pharr, TX 78577   (Hidalgo County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $5,300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Hidalgo County Regional Mobility Authority is seeking a qualified firm to complete final design, install, test, implement, operate, and maintain a Toll Collection Sytem (TCS) to support the 365 Toll Project. The system will integrate with HCRMA's seperately acquired Third-Party Back Office System (BOS). Each entity (Proposer) submitting a Proposal will be evaluated based on the criteria set forth in this Request for Proposals (RFP). THe final selection of the Toll System Integrator (TSI), if any, will be made by the BOard of Directors of the HCRMA based upon the recommendation of the Selection Committee following evaluation of the responses. HCRMA reserves the right to summarize questions, combine similar questions, decline to answer questions, or to modify the content of questions to protect the identity of the requestor or as is otherwise deemed to be in the best interest of the RMA. The method of contractor selection has not been determined at this time.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents