Similar Projects
Construction Management/General Contractor (CM/GC) Services for a New Santaquin City Hall
New Construction
Design
Less than $6,000,000 est. value
Santaquin, UT 84655

New Washington County Administration Building
New Construction - 141,702 SF
Post-Bid
Less than $15,000,000 est. value
Saint George, UT

New Washington County Administration Building
New Construction - 141,702 SF
Post-Bid
Less than $15,000,000 est. value
Saint George, UT

Ivins Replacement City Hall
New Construction
Results
Less than $3,900,000 est. value
Ivins, UT 84738

Richfield Courthouse Remodel-Probation Area
Results
Richfield, UT 84701

Construction Management at Risk New City Hall Stage 2
Construction
$25,000,000 est. value
Murray, UT

Cannonville Town Hall and Medical Center Addition
Addition
Post-Bid
Cannonville, UT

Downtown City Hall Redevelopment
Results
Provo, UT 84606

Ivins City Hall Replacement
Post-Bid
Ivins, UT 84738

City Hall P and C Addition and Remodel
Renovation, Addition
Results
Less than $385,000 est. value
South Ogden, UT 84403

Addition to The Central Valley Town Clerk/Treasurer
Post-Bid
Central, UT 84754

DFCM Construction-Pre-Qualified General Contractors-Matheson Courthouse Seismic Repairs
Results
Less than $750,000 est. value
Salt Lake City, UT 84114

Construction Manager as Constructor (CMC) Services - Frank E. Moss Courthouse Seismic Upgrades, Backfill, & Building Renovation
Renovation
Post-Bid
$75,000,000 to $90,000,000 est. value
Salt Lake City, UT

DFCM Construction-Pre Qualified General-Matheson Courts OFA Remodel
Renovation
Results
Less than $160,000 est. value
Salt Lake City, UT 84111

Construction of Honeyville City Hall
New Construction
Post-Bid
Honeyville, UT 84314

Reported 01/10/2020 04:51 PM
Project Title

Iron County Justice Center

Physical Address View project details and contacts
City, State (County) Cedar City, UT 84720   (Iron County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method
Project Status Construction Complete as of 2019
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. Demolition a. Remove walls, cabinets, counter tops, electrical and data as need for new office layout save counter tops and cabinets to be reused 2. Framing a. Metal stud walls per plan for new office layout b. Metal door frame to match existing doors frames and wood door to match exiting cherry wood doors 3. Electrical a. Install 120-volt outlets per plan b. Move and add lights for new layout c. Move and add data per plan d. Install 240-volt for point of use water heater 4. Plumbing a. Roof in sink i. Cut in drain on existing cast iron vent ii. Water line for sink and refrigerator b. Electric tankless water heater c. Drop in deep stainless-steel sink and high arc faucet 5. Drywall a. Install and repair drywall as needed-match existing finish 6. Painting a. Use existing colors with one accent wall 7. Drop celling a. Install and repair drop celling as needed i. County will supply ceiling tiles 8. Cabinets a. Move existing customer service counter and cabinets to new location b. Install cabinet per plan for new layout use existing cabinets if possible 9. Counter top a. Install counter top per plan-match existing counter top as close as possible 10. Finish carpentry a. Add Cherry wood door with stainless-steel hardware b. Add chair rail will match cabinets i. Chair rail will be in offices throughout the building-see plan for locations 11. Flooring a. Prep and level concrete for new flooring b. Install EVT Shaw contract Forged Concrete 03507 or equivalent.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents