Similar Projects
Hickory Village at Lake Gentry
New Construction, Infrastructure
Conception
$212,400,000 CJ est. value
Saint Cloud, FL 34772

Osceola Parkway Extension Cyrils Drive to Nova Road - Central Florida Expressway Authority
Infrastructure
Conception
$800,000,000 CJ est. value
Kissimmee, FL 34746

Nolte Road Commercial Park Master Plan
New Construction
Design
Saint Cloud, FL 34772

SkydiveXperience
New Construction, Infrastructure - 30,000 SF
Design
$45,000,000 CJ est. value
Kissimmee, FL 34747

Neptune Road Widening from Partin Settlement to South of Kings Crest Road
Infrastructure
Bidding
$500,000 CJ est. value
Kissimmee, FL 34744

Construction Services for Kissimmee to St. Cloud Connector Trail Project
Infrastructure
Bidding
$500,000 CJ est. value
Kissimmee, FL 34741

Homewood Suites
New Construction - 98,372 SF
Post-Bid
Celebration, FL 34747

Storcon Self-Storage Facility
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Buena Ventura Lakes, FL 34743

Taxiway E Extension (24 END) and Obstruction Removal at Kissimmee Gateway Airport
Infrastructure
Results
$7,770,206 CJ est. value
Kissimmee, FL 34741

Indian Lakes Reuse Main Relocation
Infrastructure
Results
$214,650 CJ est. value
Saint Cloud, FL 34772

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Mystic Dunes Resort - Guest Rooms
Renovation - 179,160 SF
Construction
Celebration, FL 34747

Canoe Creek Road Widening Project - Osceola County
Infrastructure
Pending Verification
$700,000 CJ est. value
Saint Cloud, FL 34773

Comfort Inn & Suites and Mainstay Suites
Demolition, New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Kissimmee, FL 34744

4 Winds Boulevard Apartments
New Construction, Infrastructure
Conception
$55,000,000 CJ est. value
Kissimmee, FL 34746

Last Updated 09/19/2023 01:54 PM
Project Title

Waterstar Orlando - Landscaping and Irrigation

Physical Address View project details and contacts
City, State (County) Kissimmee, FL 34747   (Osceola County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Site Development
Contracting Method Bids by Invitation
Project Status Occupancy, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

This project has been completed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents