Similar Projects
Calder Casino Industrial Park
New Construction, Infrastructure - 2,300,000 SF
Conception
$700,000,000 est. value
Miami Gardens, FL 33056

West Aventura Town Center
New Construction, Build-Out, Demolition - 44,099 SF
Design
Aventura, Miami, FL 33180

Everglades National Park Project NP SER PMS FY22(1)
Infrastructure
Design
$2,000,000 to $5,000,000 est. value
Homestead, FL 33030

Maintenance and Repair Work for City Roads, Streets and Facilities
Infrastructure
Bidding
$220,000 est. value
Aventura, FL

Roadway Resurfacing - Multiple Sites
Infrastructure
Bidding
$4,234,195 est. value
Miami Springs, FL

Bridge Replacement at SW 136 Street Over C-100A Canal - Bridge No. 874420
New Construction
Post-Bid
$1,707,083 est. value
FL

Roadway Improvements to SW 22 Avenue from US-1 to Coral Way
Post-Bid
$559,425 est. value
Miami, FL 33010

North Cruise Boulevard Extension Phase III
Results
Less than $11,834,424 est. value
Miami, FL

Design-Build Services for Roadway Improvements to NE 2nd Avenue
Results
Less than $10,307,626 est. value
Miami, FL 33128

Biscayne House
New Construction, Infrastructure - 88,103 SF
Design
$24,000,000 est. value
Miami, FL 33137

Roadway Resurfacing - Multiple Sites
Infrastructure
Bidding
$300,000 est. value
Miami, FL

Construction Services for a Roadway Improvement
Post-Bid
Miami Shores, FL 33150

Asphalt Paving, Resurfacing and Drainage
Term Contract
Results
Miami, FL 33144

27th Avenue Mixed Use Development
New Construction, Infrastructure - 55,820 SF
Design
$15,000,000 est. value
Miami, FL 33142

Northwest 116 Way and Northwest 106 Terrace Roadway and Drainage
Infrastructure
Bidding
$2,000,000 est. value
Medley, FL 33166

Reported 07/12/2022 12:41 PM
Project Title

GGI Interchange - 437053-3 - Florida Department of Transportation

Physical Address View project details and contacts
City, State (County) Miami, FL 33131   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Design Development, Construction Start Expected January 2024
Bids Due View project details and contacts
Estimated Value $39,261,947
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

I-95 Reconstruction Southbound 0.472 Miles As of July 2022, the project is currently in the design phase. Construction is anticipated to begin in January 2024.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents