Similar Projects
Satellite Energy Plant (SEP) Cooling Tower Repair
Bidding
$350,000 est. value
Las Vegas, NV 89154

Replacement of Boiler/Cooling Tower and Heat Pumps at Agnes Risley Elementary School
Alteration
Bidding
$1,883,000 est. value
Sparks, NV 89431

Fume Hood
Post-Bid
Las Vegas, NV

Replace Ductwork In Dehumidifiers
Post-Bid
Las Vegas, Nelson, NV

J045--Chiller Comprehensive Service and Maintenance
Results

J045--Chiller Comprehensive Service and Maintenance
Results

Community Center Rooftop HVAC Unit 1 and 2 Replacement Project
Alteration
Bidding
$450,000 est. value
Carson City, NV 89701

99 Ces Replacement Boiler Building 777
Term Contract
Post-Bid
Nellis AFB, Nellis Air Force Base, NV 89191

SWRF Untreated Air Pipe Replacement
Results
$1,225,000 est. value
Henderson, NV

HVAC Filter Service
Alteration
Bidding
Las Vegas, NV

Central Plant Renovation, High Desert State Prison
Alteration
Post-Bid
$7,300,000 est. value
NV

West Charleston Building C - 2nd Floor HVAC Replacement Phase A
Results
$319,000 est. value
Las Vegas, North Las Vegas, NV 89146

90 Ton High Ambient Air-Cooled Chiller
Alteration
Post-Bid
Las Vegas, NV 89106

West Flamingo Senior Center Pool Locker Room HVAC Upgrade
Results
$126,350 to $133,000 est. value
Las Vegas, NV

Replace HVAC Components, Roof, and Security Walter Johnson Junior High School Academy of International Studies
Alteration
Post-Bid
$7,614,477 est. value
Las Vegas, NV 89145

Last Updated 03/14/2022 10:24 AM
Project Title

Air Handler Replacements - Phase I at Edward C. Reed High School

Physical Address View project details and contacts
City, State (County) Sparks, NV 89434   (Washoe County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of seven (7) existing multi-zone air handlers (AH2, AH8, AH12, AH14, AH15, AH21 and AH22) with new variable refrigerant flow heat pump type air handlers. Units to be installed on existing curbs. This work includes modification to condensates, gas lines, electrical, and upgrades to DDC control system. Replacement of one (1) additional existing multi-zone air handler (AH5) with new variable refrigerant flow heat pump type air handlers.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents