Similar Projects
Greenwood Stormwater Basin
Post-Bid
Niles, IL 60714

Grasslands Grading Improvements
Post-Bid
Orland Park, IL

I-19-4476 Roadway and Bridge Widening and Reconstruction
Results
$25,000,000 to $50,000,000 est. value
IL

Terminal Area Fire Main Relocation - Lower Level Utility and Pavement Reconstruction
Results
Chicago, IL

Lincoln Yards South Package A-1 & B
Construction
Chicago, IL 60632

2021 Road Maintenance Program
Post-Bid
Inverness, IL

2021 Crack Routing and Sealing
Results
Hanover Park, IL

Street Resurfacing Program
Renovation
Post-Bid
Mount Prospect, IL

Grand Avenue Improvements
Renovation
Results
Chicago, IL 60600

Hilltop Elementary School Tennis Courts & Asphalt Paving
Post-Bid
Elgin, IL 60120

2021 Street Improvement Program
Results
Less than $464,820 est. value
Morton Grove, IL

Site Paving
Post-Bid
Elgin, IL 60120

Hart Road and Main Street Water Main Replacement
Results
Less than $563,165 est. value
Barrington, IL

2021 Paving Work at Conant, Fremd, Hoffman Estates, Palatine and Schaumburg High Schools
Post-Bid
Palatine, IL

Pavement Resurfacing
Results
Less than $2,760,387 est. value
Palatine, IL

Reported 07/07/2022 12:00 AM
Project Title

2022 Street Program

Physical Address View project details and contacts
City, State (County) Chicago Ridge, IL   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids. Bids by Invitation.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $990,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of 3" grind and overlay, full depth asphalt removal, hot-mix asphalt surface course, hot-mix asphalt binder course, curb and gutter removal and replacement, sidewalk removal and replacement, preparation of base, driveway removal and replacement, aggregate base repair, structure adjustments, pavement patching, landscape restoration, and all other work necessary to complete the work as described in the contract documents.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents