Similar Projects
Ellisville Wastewater Plant Expansion
Design
FL

Water Reclamation Facility Expansion
Addition
Design
Clermont, FL

Valrico Treatment Plant Structural Rehabilitation Project
Renovation
Bidding
$391,236 est. value
Dover, FL 33527

Lime Softening Water Treatment Plant SCADA PLC Hardware Modifications and Filter Control Upgrades
Bidding
$175,000 est. value
Bartow, FL 33830

Privatization of the Wastewater Collection System at U.S. Navy Station Mayport, FL
Post-Bid
Jacksonville, Mayport, FL 32233

Towns Water Treatment Facility (WTF)
Post-Bid
Greenville, FL 32331

General Electrical Design - Substations 9, 10, 11, and 12
Results
Less than $6,430,280 est. value
Miami, FL 33010

Sumterville Water Plant Improvements
Results
Less than $400,000 est. value
Bushnell, Sumterville, FL 33585

RWRF Phase I Plant Improvements
Construction
Less than $6,700,000 est. value
Altamonte Springs, FL

Hodge Street Water Production Facility Upgrades
Construction
$1,970,000 to $2,436,210 est. value
Satsuma, FL 32189

Meadowlake Water Treatment Plant Expansion
Design
Less than $1,686,000 est. value
FL

City of Cocoa Chemical Conversion and Reliability Improvements
Post-Bid
Christmas, FL 32709

Doug Allen WRF SBR Improvements
Results
$10,000,000 to $15,000,000 est. value
Bartow, FL 3831

Greenland Water Treatment Plant (WTP) - Expansion from 6.0 to 9.0 MGD
Addition
Construction
Jacksonville, FL 32256

Water Treatment Plant Expansion
Addition, Term Contract
Post-Bid
Immokalee, FL 34142

Last Updated 02/21/2020 07:50 AM
Project Title

Replacement of 48in Butterfly Valve and Actuator on Hydrotreaters

Physical Address View project details and contacts
City, State (County) Miami, FL 33173   (Miami-Dade County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $484,000
Plans Available from County Agency - 12/26/19
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of furnish and install three (3) 48-inch butterfly valves replacing the existing on the 48-inch ductile iron pipe (DI) influent line for the Softeners 9, 10 and 12 at the Alexander Orr Jr. Water Treatment Plant

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 40 - Process Integration, Primary Control Devices, Linear Actuators and Positioners, Rotary Actuators.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents