Similar Projects
Ellisville Wastewater Plant Expansion
Design
FL

Water Reclamation Facility Expansion
Addition
Design
Clermont, FL

Valrico Treatment Plant Structural Rehabilitation Project
Renovation
Bidding
$391,236 est. value
Dover, FL 33527

Lime Softening Water Treatment Plant SCADA PLC Hardware Modifications and Filter Control Upgrades
Bidding
$175,000 est. value
Bartow, FL 33830

Privatization of the Wastewater Collection System at U.S. Navy Station Mayport, FL
Post-Bid
Jacksonville, Mayport, FL 32233

Towns Water Treatment Facility (WTF)
Post-Bid
Greenville, FL 32331

General Electrical Design - Substations 9, 10, 11, and 12
Results
Less than $6,430,280 est. value
Miami, FL 33010

Sumterville Water Plant Improvements
Results
Less than $400,000 est. value
Bushnell, Sumterville, FL 33585

RWRF Phase I Plant Improvements
Construction
Less than $6,700,000 est. value
Altamonte Springs, FL

Hodge Street Water Production Facility Upgrades
Construction
$1,970,000 to $2,436,210 est. value
Satsuma, FL 32189

Meadowlake Water Treatment Plant Expansion
Design
Less than $1,686,000 est. value
FL

Replacement of 48in Butterfly Valve and Actuator on Hydrotreaters
Post-Bid
Less than $484,000 est. value
Miami, FL 33173

Fiveash Water Treatment Reliability Upgrades and Disinfection Systems Replacement
Results
Less than $1,250,000 est. value
Fort Lauderdale, FL

Greenland Water Treatment Plant (WTP) - Expansion from 6.0 to 9.0 MGD
Addition
Construction
Jacksonville, FL 32256

City of Cocoa Chemical Conversion and Reliability Improvements
Post-Bid
Christmas, FL 32709

Last Updated 11/28/2019 01:33 AM
Project Title

Doug Allen WRF SBR Improvements

Physical Address View project details and contacts
City, State (County) Bartow, FL 3831   (Polk County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $15,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of rehabilitation and expansion of the Doug Allen Water Reclamation Facility, including rehabilitation of existing blowers and blower electrical and instrumentation systems; rehabilitation of existing batch reactors, including replacement of existing mixing and sludge pumps and replacement of existing jet headers and decanters; construction of an additional batch reactor, including all necessary equipment; repairs to the existing chlorine contact chamber and effluent pumping wet well; replacement of the existing effluent pumps; emergency generator, miscellaneous site work, instrumentation for the control system, connecting existing equipment, and start-up services for the new system, as well as replacement of all necessary civil, structural, mechanical and electrical work required for a complete, operating facility.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents