Similar Projects
Waterset By Newland
New Construction
Conception
Apollo Beach, FL 33572

Wastewater Pumping Station Rehabilitations Design-Build
Design
Less than $19,000,000 est. value
Tampa, FL 33602

East Selmon Expressway Slip Ramps Design-Build
Design
Tampa, FL

West Burke Street Gravity Main Replacement
Infrastructure
Bidding
$1,201,640 CJ est. value
Tampa, FL 33614

West Burke Street Gravity Main Replacement
Infrastructure
Bidding
$1,201,640 CJ est. value
Tampa, FL 33614

Forest Brooke Subdivision, Collector Road 2nd Extension Phases 2 and 3 - Site Development
Post-Bid
Wimauma, FL

Inspection, Management, and Performance of Maintenance on All Components on and along Interstate Highway I-75 in Hillsborough, Pasco, and Hernando Counties
Post-Bid

Davis Islands Bridge 105606 Repair
Results
Less than $365,800 est. value
Tampa, FL 33602

I-75 Big Bend Road
Results
FL

The Motor Enclave
New Construction - 16,000 SF
Construction
$100,000,000 est. value
Tampa, FL 33610

Construction Services - Enterprising Latinas
Construction
Wimauma, FL 33598

Northwest Wastewater Plant Operations Building
New Construction - 1,500 SF
Design
$8,000,000 to $10,000,000 est. value
Tampa, FL

Low Pressure Sewer System (LPSS) SCADA Equipment Installation and Monitoring
Renovation
Bidding
$3,631,800 CJ est. value
Tampa, FL 33602

Rice Road Potable Water Main Extension
Post-Bid
Plant City, FL 33566

I-75 MLK DDI
Results
FL

Last Updated 08/04/2022 01:03 PM
Project Title

Capital Improvement - Hillsborough County

Physical Address View project details and contacts
City, State (County) Tampa, FL 33602   (Hillsborough County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Lift and Pump Stations, Maintenance, Paving/Reconstruction, Sewage Treatment Plant, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,500,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for bridge replacements, bridge repairs, intersection improvements, sidewalks, pavement preservation, paved shoulders, and safety improvements. A new wastewater reclamation facility with a new potable water treatment facility, as well as construct conveyance and pumping systems for wastewater and reclaimed water. A set of consolidated and hardened maintenance facilities projects funded in large part by a 2019 bond will design and construct four new facilities for the Public Works, Public Utilities, and Fleet Services Departments to replace the west, east, and south service units and the Traffic Operations Maintenance Facility at Sabal Park. The current facilities are 40 to 50 years old and are near the end of their useful lives. The new facilities will provide efficient and secure shelter for pre- and post-disaster response. One new project has been added to the Solid Waste Enterprise Capital Budget. The Hillsborough County Material Recovery Facility MRF project is planned to be a 35-ton per hour, single-stream recycling facility designed to process the County residential recyclables and operated via a public-private partnership P3.Phase 2 of the Brandon Library replacement project would provide $10.5 million in funds to design and construct a new, expanded, and relocated library in Brandon. Funds also may be used for improvements to the existing facility. Six continuing projects will renovate existing libraries at Austin Davis, Fendig, Lutz, North Tampa, Southshore, and Town N Country. The South County Cultural Arts Center project will develop options for locations, scope, and cost for a $3.1 million cultural arts center in the Southshore area of Hillsborough County. Various options will be considered, including partnering with Hillsborough Community College. As of August 3, 2021, this project is part of the Hillsborough County Capital Improvement proposed budget for fiscal year 2021-2025.It is currently unknown what approvals have been obtained. Information regarding design firm and general contractor selection has not been disclosed. A construction timeline has not been released. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Expansion Control.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents